| LIMITED Tenders/Contracts/Purchases of goods/services floated/awarded by the Company | |||||||||||||||||||
| Note: Only REGISTERED VENDORS may submit their quotation. For registration as vendor, please refer Vendor Registration Page under "Tender" from homepage. | |||||||||||||||||||
| Year | Month | LIMITED TENDERS FLOATED BY THE COMPANY | CONTRACTS AWARDED BY THE COMPANY | ||||||||||||||||
| Division | Sl.No. | Tender/Enquiry No. | Date of Publication of Tender/Enquiry | Item/Nature of Work | Type of Bidding (Single(1)/ Two Bid(2) System) | Last date of receipt of tender | No. of Tenders received | Nos. and names of parties qualified after technical evaluation | Nos. and names of parties not qualified after technical evaluation | Whether contract awarded to Lowest tenderer(L1)/ Evaluated L1(E1) | Contract No. and Date | Name of Contractor | Value of Contract (Rs.L) | Scheduled date of completion of supplies | |||||
| Description | Unit | Qty. | |||||||||||||||||
| 2007 | Nov | PR | 1 | PROJ/NASL/026 | 1-Nov-07 | Survey of 33KV Line and Peg marking on 13 mtr. Rail pole location as per enclosed BLL's drawing | km | 3 | Single(1) | 8-Nov-07 | 3 | 3 (Mukti Traders, J.S. Construction, Sri Bisnu Construction Co.) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/028 dt. 19.12.07 | Sri Bisnu Construction Co. | 316500 | 30 days | |
| Erection of 13 Mtr. (60kg/mtr) Rail Pole(single) as per enclosed BLL's drawing no. NASL/NESCL/RANCHI/ EL/001 for 33 KV O/H line along with painting by one coat of Red oxide primer and two coat of Aluminium paint . It also includes digging and filling of soil, levelling/alignment, etc. | No. | 27 | |||||||||||||||||
| Erection of 13 Mtr. (60kg/mtr) Rail Pole(double) as per enclosed BLL's drawing no. NASL/NESCL/RANCHI/ EL/001 for 33 KV O/H line along with painting by one coat of Red oxide primer and two coat of Aluminium paint . | No. | 24 | |||||||||||||||||
| PR | 2 | PROJ/DVC-BIADA/051 | 2-Nov-07 | TMT BAR (Fe 415) - 8mm | TON | 0.80 | Single(1) | 8-Nov-07 | 3 | 3 (Sandeep Enterprises, Jaya Enterprises, Hemadri Steel Traders) | nil | Lowest tender(L1) | BLL/PROJ/DVC-BIADA/ORD/051 Dt. 22.11.07 | Sandeep Enterprises | 845354 | 3 days staggered | |||
| -- do -- - 10 mm | TON | 1.05 | |||||||||||||||||
| -- do -- 12 mm | TON | 10.45 | |||||||||||||||||
| -- do -- 16 mm | TON | 11.00 | |||||||||||||||||
| -- do -- 20 mm | TON | 0.20 | |||||||||||||||||
| -- do -- 25 mm | TON | 0.90 | |||||||||||||||||
| CNMBW | 3 | 9253/AS | 1/11/2007 | MFG. OF NEW COMMUTATOR AS PER SAMPLE (42 KW BHEL 205 SEG. SEG OD 250, RISER OD 330, SEG LENGTH 96 MM, RISER WIDTH 16 MM. ) | NO | 2 | SINGLE | 08/11/2007 | |||||||||||
| CNMBW | 4 | 9260/AS | 7/11/2007 | 1.BALL BEARING 6328 (SKF / FAG ). | NO | 1 | SINGLE | 15/11/2007 | 3 | 1.ISHAN INTERNATIONAL. 2.SUTCO BEARING INDIA(P) LTD. 3.UDAY ENTERPRISE | NIL | L - 1 | MB/11410/ERDt.27-nov-07 | Ishan internatiol | 71489 | One Week | |||
| 2. ROLLER BEARING NJ328 (SKF / FAG ). | NO | 1 | |||||||||||||||||
| CNMBW | 5 | 9256/AS | 6/11/2007 | 1.BALL BEARING 6315,MAKE (SKF / FAG ). | NO | 1 | SINGLE | 15/11/2007 | 3 | 1.ISHAN INTERNATIONAL. | NIL | L - 1 | MB/11413/ERDt.27-nov-07 | Ishan internatiol | 71489 | One Week | |||
| 2. ROLLER BEARING 6317. MAKE: (SKF / FAG ). | NO | 2 | 2.SUTCO BEARING INDIA(P) LTD. | ||||||||||||||||
| 3. ROLLER BEARING N320 (SKF / FAG ). | NO | 2 | 3.UDAY ENTERPRISE | ||||||||||||||||
| CNMBW | 6 | 9259/AS | 7/11/2007 | 1.150MM2 ATCC SILICON RUBBER FLAME RETARDENT CABLE. | MT | 100 | SINGLE | 15/11/2007 | 3 | 1.British Electric Manufacturing Co. | Nil | L-1 | MB/11414/ER Dt.03/12/2007 | NISHANT MARKETING & MF G CO. | 216008 | WITHIN 6 WEEKS | |||
| 2.16MM2 ATCC SILICON RUBBER FLAME RETARDENT CABLE. | MT | 200 | 2. M.Hari Dass & Co. pvt.LTD. | ||||||||||||||||
| 3.95MM2 ATCC SILICON RUBBER FLAME RETARDENT CABLE. | MT | 100 | 3. Nishant Marketing & MFG. Co. | ||||||||||||||||
| CNMBW | 7 | 9293/AS | 23/11/2007 | EN DGC COPPER COND.(2.1X3.5)MM2.E1G1. | KG | 350 | SINGLE | 30/11/2007 | 3 | 1.Paramount Conductors ltd. 2.Swarnagiri Wire Insulations PVT. LTD. 3. Sagun Copper Conductors(P) LTD. | NIL | L-1 | MB/11438/ER Dt.14-12-2007 | Sagun Copper Conductors(P) LTD. | 171512.41 | Within 15 days | |||
| CNMBW | 8 | 9296/AS | 23/11/2007 | MFG OF NEW ETP COMMUTATOR AS PER SAMPLE. SEG:195. | NO | 1 | SINGLE | 30/11/2007 | |||||||||||
| CNMBW | 9 | 9299/AS | 23/11/2007 | bare copper conductor ( 1.94X 24.95)mm2 | KG | 110 | SINGLE | 30/11/2007 | 2 | 1.Paramount Conductors Ltd. 2. Prakash Traders | Nil | L-1 | MB/11440/ER Dt.14-12-07 | PRAKASH TRADERS | 58344 | Within 15days. | |||
| CNMBW | 10 | 9301/AS | 23/11/2007 | MFG OF NEW COMMUTATOR AS PER SAMPLE/DRAWING | NO | 2 | SINGLE | 30/11/2007 | 1 | The Bengal Commutators Works. | NIL | L-1 | MB/11463/ER Dt.24-12-2007 | The Bengal Commutator Works. | 178880.00 | Within 60 days | |||
| CNMBW | 11 | 9304/AS | 23/11/2007 | DGC COPPER COND FOR MAIN COIL. (3.2 x 7) MM2 | KG | 260 | SINGLE | 30/11/2007 | |||||||||||
| CNMBW | 12 | 9307/AS | 23/11/2007 | EN DGC COPPER COND AS PER IS 10114. (1.4 X 6.3 ) MM2. | KG | 110 | SINGLE | 30/11/2007 | |||||||||||
| CNMBW | 13 | 9267/SP | 23/11/2007 | 1.Calibration of LCR | NO | 1 | SINGLE | 03/12/2007 | |||||||||||
| 2. Calibration of Micro OM Meter, Agronic Make | NO | 1 | |||||||||||||||||
| 3. Calibration of Micro OHM Meter, Dot Tech Make. | NO | 1 | |||||||||||||||||
| 4. Calibration of EMC Make Motor Checker Sl-no.3371. | NO | 1 | |||||||||||||||||
| CNMBW | 14 | 9270/SP | 23/11/2007 | 1.Calibration of AC Ammeter, AE Make 10A.30A,100A. | NO | 1 | SINGLE | 03/12/2007 | |||||||||||
| 2. Calibration of Digital True RMS Power Meter. | NO | 1 | |||||||||||||||||
| 3. Calibration of Digital Cont./Non Cont. Tacho Meter. | NO | 1 | |||||||||||||||||
| 4. Calibration of Digital Thermometer. Sisedo make | NO | 1 | |||||||||||||||||
| CNMBW | 15 | 9266/SP | 23/11/2007 | 1.Calibration of 0-10KV AC H.V. Tester. | NO | 1 | SINGLE | 03/12/2007 | |||||||||||
| 2. Calibration of 25KV High Voltage set | NO | 1 | |||||||||||||||||
| 3. Calibration of 3.0KV High Voltage set. W/H Make. | NO | 1 | |||||||||||||||||
| 4. Calibration of surge Comparison Tester, Jabbals MK. | NO | 1 | |||||||||||||||||
| CNMBW | 16 | 9265/SP | 23/11/2007 | 1.Calibration of 500V Hand Megger | NO | 1 | SINGLE | 03/12/2007 | |||||||||||
| 2. Calibration of 2.5KV CIE Make Hand Megger | NO | 1 | |||||||||||||||||
| 3. Calibration of josts Make 500V Hand Megger. | NO | 1 | |||||||||||||||||
| 4. Calibration of WACO Make Motorised Megger. | NO | 1 | |||||||||||||||||
| CNMBW | 17 | 9271/SP | 23/11/2007 | 1.Calibration of SEW MAKE Clamp Meter | NO | 1 | SINGLE | 03/12/2007 | |||||||||||
| 2. Calibration of DC Voltmeter, MECO MAKE | NO | 1 | |||||||||||||||||
| 3. Calibration of Testing panel. | NO | 1 | |||||||||||||||||
| CNMBW | 18 | 9311/AS | 26/11/2007 | POLYESTER FILM WITH NOMEX PAPER ON BOTH SIDE -O.17M | KG | 20 | SINGLE | 01/12/2007 | 1 | M/S ISOVOLTA ( INDIA ) PVT. LTD. | NIL | L - 1 | MB/11448/ER Dt.18-12-2007 | M/S ISOVOLTA (INDIA) PVT. LTD. | 33592.83 | Within 15 days. | |||
| CNMBW | 19 | 9308/AS | 26/11/2007 | 1. BALL BEARING 6244(SKF/FAG) | NO | 1 | SINGLE | 30/11/2007 | 1.Ishan International. 2.Sutco Bearing India PVT. LTD. 3.Uday Enterprise. | NIL | L - 1 | MB/11444/ER Dt.17-12-2007 | Ishan International | 261055.59 | Within 7 days | ||||
| 2. ROLLER BEARING NU 244E .M1 SKF/FAG. | NO | 2 | |||||||||||||||||
| CNMBW | 20 | 9280/AS | 17/11/07 | NOMEX PAPER 7 MIL | KG | 40 | SINGLE | 25/11/2007 | 2 | 1Commercial Supply Syndicate 2.M.s. Industries. | Nil | L - 1 | MB/11447/ER Dt.18-12-2007 | Commercial Supply Syndicate | 106870 | ON REQUEST | |||
| CNMBW | 21 | 9282/SP | 17/11/07 | LABOUR CHARGES FOR SAMICA THREM MOULDING 0F ST.COIL | NO | 240 | SINGLE | 30/11/2007 | 3 | 1.B.P.Enterprise. 2.Chillmech Techno Private Ltd. 3.Emic Motors. | Nil | L - 1 | MB/11485/ER Dt.1-1-2008 | EMIC MOTORS (P) LTD. | 52800 | Within 14 days from the date of approved sample. | |||
| CNMBW | 22 | 9316/SP | 29/11/2007 | MAGNETIC WEDGE AS PER DIMENSION FOR STATOR | NO | 310 | SINGLE | 7/12/2007 | |||||||||||
| PR | 23 | PROJ/NASL/027 | 8-Nov-07 | Boring of soil of dia - 6" including supply of boring machine, labour and all consumables for the construction of water supply line. | ft. | 400 | Single(1) | 14-Nov-07 | 3 | 3 (Maa Bhawani Construction, Subodh Kumar Singh Construction, Hari Om Construction) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/020 dt. 11.12.07 | Hari Om Construction | 138520 | 7 days from order | |||
| Supply and fixing of GI Pipe Casing 7" (Make : TATA) in the above borewell. | ft. | 140 | |||||||||||||||||
| Supply, installation, testing and commissioning of Submersible Pump(1 no.) with 1-1/2 HP motor, control panel, starter and PVC Pipe in borewell system for supply of water. | set | 1 | |||||||||||||||||
| Supply and fixing of 3C x 2.5 sq. mm cable for power connection for running of motor/pump. | mtr. | 200 | |||||||||||||||||
| Supply and fixing of Hand set tubewell complete in all respect for water supply. | set | 1 | |||||||||||||||||
| 24 | PROJ/NASL/028 | 14-Nov-07 | Data Acquisition System as per the following Scope and Technical Specification enclosed. | set | 1 | Single(1) | 21-Nov-07 | 2 | 2 (Conzerv, L&T Ltd.) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/023 dtd. 12.12.07 | Conzerv | 296493 | Hardware by end Jan`08. Installation & commissioning within 7 days of BLL's clearance. | ||||
| Scope :- | |||||||||||||||||||
| Supply and installation of Energy Management Software | |||||||||||||||||||
| Supply of cables | |||||||||||||||||||
| Supply of PC/ UPS/ Printer and all other related accessories | |||||||||||||||||||
| Wiring and Cable Connection between 11KV Panels, 33KV Relay Control Panels and Computer Base Station. | |||||||||||||||||||
| Testing and Trial Run of the System at site (Hotwar, Ranchi, NASL site). | |||||||||||||||||||
| Any other items / accessories required to make the system full proof. | |||||||||||||||||||
| 25 | PROJ/NASL/029 | 19-Nov-07 | Storage-cum-Erection Insurance and Workmen Compensation Insurance Coverage for NASL- Ranchi, Jharkhand site. | months | 6 | Single(1) | 24-Nov-07 | 2 | 2 (United India Insurance, The New India Assurance Company Limited) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/018 Dt. 27.11.07 | United India Insurance Co. Ltd. | 67203 | Insurance for 6 months | ||||
| 26 | PROJ/NASL/030 | 19-Nov-07 | Earth work in excavation of foundation in all types of soil including removing, spreading or staking the soil within a lead of 75 mtrs. & providing necessary sorring (if required) as directed. The items includes necessary trimming, laveling dressing and ramming the bottom, including necessary dewatering. | Cu. Mtr. | 200 | Single(1) | 24-Nov-07 | 3 | 3(Hari Om Construction, Subodh Kumar Singh Construction, Maa Bhawani Construction) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/031 Dt. 24.12.07 | Hari Om Construction | 1009800 | 20 days | ||||
| Labour charges for back filling in foundation by excavated earth in layers not exceeding 150 mm as directed and consolidated same by through saturation with water ramming complete. | Cu. Mtr. | 30 | |||||||||||||||||
| Providing & casting Plain Cement Concrete (1:4:8) with graded stone chips (20 mm size) in all types of foundations including side shuttering complete in all respects as per direction of site-in-charge. | Cu. Mtr. | 15 | |||||||||||||||||
| Providing & casting Reinforced cement concrete (RCC) nominal mix (1:1.5:3) M-20 grade concrete excluding shuttering & reinforcement with graded stone chips (20 mm size) mix including testing of cube as per IS 456 and direction of Engg.in Charge. | Cu. Mtr. | 98 | |||||||||||||||||
| Straightening, cutting & bending of Reinforcement (TMT Bars) as per the size and shape described in the approved drawing. The scope also includes binding of wires (including supply) with every inter section, complete in all respects as per direction of site-in-charge. | MT | 30 | |||||||||||||||||
| Hiring and shuttering charges of shuttering materials made with Ply Board with necessary support & proping. The scope includes complete shuttering for RCC work in column, beams and in foundations including all materials like nails, oil, plactic sheets etc. complete in all respects as per the drawing and direction of site-in-charge. | Sq. Mtr. | 2000 | |||||||||||||||||
| Fitting & Fixing of MS/G.I. Bolt with the R.C.C foundation work as per the approved drawings,complete in all respects as per direction of site-in-charge. | Nos. | 200 | |||||||||||||||||
| 27 | PROJ/NASL/031 | 20-Nov-07 | Supply of TMT Bars as per relevant IS in good conditions of various sizes as given below | Single(1) | 27-Nov-07 | 3 | 3 (R.K. Construction, Maa Bhawani Construction, Subodh Kumar Singh Construction) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/026 dt. 17.12.07 | R.K. Construction | 911700 | 3 days staggered | ||||||
| TMT BAR - 6 mm. dia | MT | 0.5 | |||||||||||||||||
| TMT BAR - 8 mm. dia | MT | 5.0 | |||||||||||||||||
| TMT BAR - 10 mm. dia | MT | 8.0 | |||||||||||||||||
| TMT BAR - 12 mm. dia | MT | 7.0 | |||||||||||||||||
| TMT BAR - 16 mm. dia | MT | 2.0 | |||||||||||||||||
| 28 | PROJ/NASL/032 | 20-Nov-07 | G.I STRUCTURE FOR 33KV SWITCHYARD. | MT | 28 | Single(1) | 3-Dec-07 | 2 | 1)M/s Rabi Engineering Works 2) M/s Asoka Tolls Pvt. Ltd | N/A | Lowest (L1) | BLL/PROJ/NASL-R/ORD/25, dt. 13.12.07 | M/s Asoka Tools Pvt. Ltd | 1562067 | Within 15th Feb,2008 | ||||
| 29 | PROJ/NASL/033 | 20-Nov-07 | 415V, AC Distribution Board (ACDB) of Sheet Steel enclosed cubicle floor mounting type and other accessories for catering auxiliary power supply of the 33/11KV Sub station as per enclosed 'Technical Specification'. | Nos. | 1 | Single(1) | 28-Nov-07 | 3 | 3 (Technocommerce, OPG Power Systems Pvt. Ltd., Devika Electrical Industries) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/.. Dt. 22.12.07 | OPG Power Systems Pvt. Ltd. | 81503 | within 4 weeks | ||||
| 30 | PROJ/NASL/034 | 23-Nov-07 | 11KV 90KN Ball and Socket type Disc Insulators as per Technical Specification (enclosed) | nos. | 1533 | Single(1) | 30-Nov-07 | 2 | 2 (Aditya Birla Insulators, India Potteries Ltd.) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/022 dtd. 11.12.07 | India Potteries Ltd. | 825551 | 30 days. | ||||
| 33KV Bus Post Insulator for sub station as per Technical Specification (enclosed) | nos. | 7 | |||||||||||||||||
| 31 | PROJ/NASL/035 | 23-Nov-07 | HOT DIP GALVANISED GI EARTHING STRIP | Single(1) | 30-Nov-07 | ||||||||||||||
| A) 50MM X 6MM GI STRIP | MT | 4.5 | |||||||||||||||||
| B) 25MM X 3MM GI STRIP | MT | 0.4 | |||||||||||||||||
| 32 | PROJ/NASL/036 | 24-Nov-07 | TERMINATION & JOINTING KIT | Single(1) | 4-Dec-07 | 3 | 1) Sheth Trading Corporation 2) 3M Electro & Comminication India Pvt. Ltd 3)Sunil & Company | Nil | Yes | BLL/PROJ/NASL-R/ORD/024, dt. 13/12/07 | Sheth Trading Corporation | 192427 | within 2 weeks from the date of receipt of approved drawing. | ||||||
| 1. 19 / 33KV End Termination Kit suitable for 1Cx800 sq mm XLPE insulated Al. Wire armoured cable (outdoor type) , O.D - 68 (+/-) 3mm, Make of Cable: Torrent | Nos | 16 | |||||||||||||||||
| 2. 19 / 33KV Jointing Kit suitable for 1Cx800 sq mm XLPE insulated Al. Wire armoured cable (outdoor type) , O.D - 68 (+/-) 3mm, Make of Cable: Torrent | Nos. | 7 | |||||||||||||||||
| 3. 6.35 /11KV End Termination Kit suitable for 1Cx1000 sq mm XLPE insulated Al. Wire armoured cable (Indoor type) , O.D - 61 (+/-) 3mm, Make of Cable: Torrent | Nos. | 18 | |||||||||||||||||
| 4. 6.35 /11KV End Termination Kit suitable for 3Cx185 sq mm XLPE insulated Al. Wire armoured cable (Indoor type) . | Nos. | 1 | |||||||||||||||||
| 4. 6.35 /11KV End Termination Kit suitable for 3Cx185 sq mm XLPE insulated Al. Wire armoured cable (outdoor type) . | Nos. | 1 | |||||||||||||||||
| 33 | PROJ/NASL/037 | 27-Nov-07 | 30V, 100AH Sealed Maintenance Free Lead Acid Battery as per Technical Specification (enclosed) | set | 1 | Single(1) | 4-Dec-07 | 1 | Exide Stores | Nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/020 dtd. 07.12.07 | Exide Stores | 60524 | 10 weeks | ||||
| 34 | PROJ/NASL/038 | 27-Nov-07 | 30V Float cum Boost Battery Charger for Charging 30V, 100AH SMF Lead acid Battery, as per Technical Specification (enclosed) | set | 1 | Single(1) | 4-Dec-07 | 1 | Hillton Electronics | Nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/021 dtd. 11.12.07 | Hillton Electronics | 59176 | 45 days | ||||
| 35 | PROJ/NASL/039 | 29-Nov-07 | Construction of Road at NASL, Hotwar, Ranchi site as per enclosed - drawing no. NASL/NESCL/RANCHI/CI/017 and Scope of Work (annex-3) complete in all respect as per instruction of BLL Site In Charge. | sq. mtr. | 210 | Single(1) | 6-Dec-07 | ||||||||||||
| CN-SGW | 36 | BLL/447 | 5-Nov-07 | BEARINGS | NOS | 8446 | 1 | 19.11.07 | 2 | N/A | N/A | L(1) | HR/43516, MDT.22.12.2007 | A.P.CORPORATION | 0.43 | ||||
| HR/43517 | LUNA BEARING | 2.37 | |||||||||||||||||
| 37 | BLL/448 | 5-Nov-07 | M.S.COMP | NOS | 48884 | 1 | 19.11.07 | 3 | N/A | N/A | L(1) | HR/43392, DT.8.12.2007 | MA BHADRAKALI ENGG.WORKS | 0.08 | SEP'08 | ||||
| HR/43393, DT.8.12.07 | P.K.ENGG.ENT | 0.09 | " | ||||||||||||||||
| HR/43394,DT.8.12.07 | WESTERN TRADING CORN | 0.96 | " | ||||||||||||||||
| 38 | BLL/449 | 5-Nov-07 | THRUST BEARINGS | NOS | 2754 | 1 | 19.11.07 | 3 | N/A | N/A | L(1) | HR/43395., DT.8.12.07 | CAPITAL BEARING | 0.88 | SEP'08 | ||||
| HR/43396, DT.8.12.07 | LUNA BEARING | 0.53 | " | ||||||||||||||||
| 39 | BLL/450 | 6-Nov-07 | O/L COIL MECH | NOS | 1609 | 1 | 19.11.07 | 3 | N/A | N/A | L(1) | HR/43569, DT.31.12.07 | HARA BROTHERS | 1.77 | OCT'08 | ||||
| 40 | BLL/451 | 6-Nov-07 | COPPER CONTACT | NOS | 668 | 1 | 19.11.07 | 3 | N/A | N/A | L(1) | HR/43515,DT.22.12.2007 | NAVEEN INDUSTRIES | 3.02 | |||||
| 41 | BLL/452 | 6-Nov-07 | M.S.COMPT | NOS | 1215 | 1 | 19.11.07 | 4 | N/A | N/A | L(1) | HR/43405,DT.14.12.07 | TAPATI ELECTRICALS | 0.26 | |||||
| HR/43406 | ACME INDUSTRIES | 0.03 | |||||||||||||||||
| HR/43407 | MICRO METALICS | 0.01 | |||||||||||||||||
| HR/43408 | ADYA ENGG.WORKS | 0.14 | |||||||||||||||||
| 42 | BLL/453 | 6-Nov-07 | BRAID CONNECTOR | NOS | 4893 | 1 | 19.11.07 | 4 | N/A | N/A | L(1) | HR/43588, DT.5.1.08 | EAGLE ENGG.WORKS | 20.65 | |||||
| 43 | BLL/454 | 6-Nov-07 | LEVER HUB | NOS | 338 | 1 | 26-11-07 | 1 | N/A | N/A | L(1) | HR/43391, DT.8.12.2007 | TRINAYANI ENGINEERING CONCERN | 0.12 | SEP'08 | ||||
| 44 | BLL/455 | 7-Nov-07 | M/C.COMP | NOS | 17624 | 1 | 14.11.07 | 2 | N/A | N/A | L(1) | HR/43266, DT.26.11.2007 | MCCOY INDUSTRIES | 0.57 | SEP'08 | ||||
| HR/43267, DT.26.11.07 | ADYA ENGG.WORKS | 0.32 | " | ||||||||||||||||
| 45 | BLL/456 | 7-Nov-07 | M/C.COMP | NOS | 600 | 1 | 14.11.07 | 3 | N/A | N/A | L(1) | HR/43368, DT.5.12.07 | MIDAS ENGG.WORKS | 0.27 | SEP'08 | ||||
| HR/43369, DT.5.12.07 | NAVA BHARAT ENT | 0.41 | |||||||||||||||||
| 46 | BLL/457 | 7-Nov-07 | C.I.STEEL 3 MM | KGS | 1540 | 1 | 16.11.07 | 2 | N/A | N/A | L(1) | HR/43324, DT.30.11.07 | CONTINENTAL STEEL SYND | 1.41 | SEP'08 | ||||
| 47 | BLL/458 | 7.11.07 | M.S.BRT.FLAT | KGS | 2891 | 1 | 16.11.07 | 4 | N/A | N/A | L(1) | HR/43323, DT.30.11.07 | CONTINENTAL STEEL SYNDICATE | 1.25 | SEP'08 | ||||
| 47 | BLL/459 | 7-Nov-07 | M.S.BRT.ROD | KGS | 4594 | 1 | 16.11.07 | 4 | N/A | N/A | L(1) | HR/43310,DT.28.11.07 | D.BISWAS | 1.17 | SEP'08 | ||||
| HR/43311,DT.28.11.07 | HARENDRA INDUSTRIES | 0.53 | |||||||||||||||||
| 49 | BLL/460 | 13-Nov-07 | PLATING ITEMS | NOS | 55537 | 1 | 23.11.07 | 2 | N/A | N/A | L(1) | HR/43551,28.12.07 | PLATING POLISHING | 11.19 | DEC'08 | ||||
| HR/43552 | RAMKRISHNA ELECTROPLATING | 10.37 | " | ||||||||||||||||
| 50 | BLL/461 | 14-Nov-07 | M/C. COMPONENTS | NOS | 28828 | 1 | 23.11.07 | 5 | N/A | N/A | L(1) | HR/43409, DT.14.12.2007 | T.M.ENGG.WORKS | 2.48 | SEP'08 | ||||
| HR/43410 | ADYA ENGG.WORKS | 1.68 | " | ||||||||||||||||
| HR/43411 | NAVA BHARAT ENT | 3.11 | " | ||||||||||||||||
| HR/43412 | KALYANI ENGG | 0.15 | " | ||||||||||||||||
| 51 | BLL/462 | 14-Nov-07 | M/C. COMPONENTS | NOS | 4528 | 1 | 23.11.07 | 4 | N/A | N/A | L(1) | HR/43388, DT.8.12.07 | T.M.ENGG.WORKS | 0.42 | SEP'08 | ||||
| HR//43389 | P.K.ENGG.ENT | 0.52 | " | ||||||||||||||||
| HR/43390 | M.S.ELECTRICAL ENGG | 0.09 | " | ||||||||||||||||
| 52 | BLL/463 | 16-Nov-07 | M/C. COMPONENTS | NOS | 2367 | 1 | 26.11.07 | 2 | N/A | N/A | L(1) | HR/43386,DT.8.12.07 | ADYA ENGG.WORKS | 0.24 | SEP'08 | ||||
| HR/43387 | TRINAYANI ENGG.WORKS | 0.34 | " | ||||||||||||||||
| 53 | BLL/464 | 19-Nov-07 | M/C. COMPT | NOS | 10292 | 1 | 29.11.07 | 2 | N/A | N/A | L(1) | HR/43428,DT.15.12.07 | WESTERN TRADING CORPN | 0.15 | SEP'08 | ||||
| HR/43429 | SOUMYA INDUSTRIES | 0.15 | " | ||||||||||||||||
| 54 | BLL/465 | 19-Nov-07 | M/C. COMP | NOS | 11061 | 1 | 29.11.07 | 4 | N/A | N/A | L(1) | HR/43424,DT.15.12.07 | BANI ENGG.WORKS | 0.04 | SEP'08 | ||||
| HR/43425 | NARENDRA NATH SAMANTA | 0.35 | " | ||||||||||||||||
| HR/43426 | KALYANI ENGINEERING | 0.08 | " | ||||||||||||||||
| HR/43427 | SOUMYA INDUSTIES | 0.28 | " | ||||||||||||||||
| 55 | BLL/466 | 20-Nov-07 | FABRICATED ITEMS | NOS | 14202 | 1 | 30.11.07 | 3 | N/A | N/A | L(1) | HR/43491,DT.20.12.07 | ADYA ENGG.WORKS | 0.76 | SEP'08 | ||||
| HR/43492 | T.M.ENGG.WORKS | 2.76 | " | ||||||||||||||||
| HR/43493 | ACME INDUSTRIES | 0.74 | " | ||||||||||||||||
| HR | 56 | ENQUIRY NO.: HR/AD/004 | 24.11.2007 | Providing service to Guests & Maintenance of Transit Accommodation at Noida, situated at IBP-BL Staff Housing Complex, A-5/1, Block H, 63C Sector - 39, Noida - 201 303 Consisting of three bed rooms (Provision of 6 boarders) with attached bathroom, one drawing room, one kitchen, one verandah, one servant's room attached with bathroom | 15.12.07 | ||||||||||||||
| CNMBW | 57 | 9311/AS | 26/11/2007 | POLYESTER FILM WITH NOMEX PAPER ON BOTH SIDE -O.17M | KG | 20 | SINGLE | 01/12/2007 | |||||||||||
| CNMBW | 58 | 9308/AS | 26/11/2007 | 1. BALL BEARING 6244(SKF/FAG) | NO | 1 | SINGLE | 30/11/2007 | |||||||||||
| 2. ROLLER BEARING NU 244E .M1 SKF/FAG. | NO | 2 | |||||||||||||||||
| PR | 59 | PROJ/NASL/034 | 23-Nov-07 | 11KV 90KN Ball and Socket type Disc Insulators as per Technical Specification (enclosed) | nos. | 1533 | Single(1) | 30-Nov-07 | |||||||||||
| 33KV Bus Post Insulator for sub station as per Technical Specification (enclosed) | nos. | 7 | |||||||||||||||||
| CNMBW | 60 | 9293/AS | 23/11/2007 | EN DGC COPPER COND.(2.1X3.5)MM2.E1G1. | KG | 350 | SINGLE | 30/11/2007 | |||||||||||
| CNMBW | 61 | 9296/AS | 23/11/2007 | MFG OF NEW ETP COMMUTATOR AS PER SAMPLE. SEG:195. | NO | 1 | SINGLE | 30/11/2007 | 2 | 1.The Bengal Commutator Works. 2.commutator MFG. | NIL | L-1 | MB/11465/ER Dt.24-12-07 | The Bengal Commutator | 29120 | Within 30 Days | |||
| CNMBW | 62 | 9299/AS | 23/11/2007 | bare copper conductor ( 1.94X 24.95)mm2 | KG | 110 | SINGLE | 30/11/2007 | |||||||||||
| CNMBW | 63 | 9301/AS | 23/11/2007 | MFG OF NEW COMMUTATOR AS PER SAMPLE/DRAWING | NO | 2 | SINGLE | 30/11/2007 | |||||||||||
| CNMBW | 64 | 9304/AS | 23/11/2007 | DGC COPPER COND FOR MAIN COIL. ( 3.2 x 7 ) MM2 | KG | 260 | SINGLE | 30/11/2007 | |||||||||||
| CNMBW | 65 | 9307/AS | 23/11/2007 | EN DGC COPPER COND AS PER IS 10114. ( 1.4 X 6.3 ) MM2. | KG | 110 | SINGLE | 30/11/2007 | |||||||||||
| CN-SGW | 66 | BLL/467 | 20-Nov-07 | SUPER ENAMELL COPPER WIRE | KGS | 7323 | 1 | 29.11.07 | 4 | N/A | N/A | L(1) | HR/43464, DT.19.12.07 | METRO TRADE AGENCY | 35.61 | ||||
| 67 | BLL/468 | 20-Nov-07 | STRANDED COPPER WIRES | KGS | 9686 | 1 | 29.11.07 | 4 | N/A | N/A | L(1) | HR/43462,DT.19.12.2007 | COMMERCIAL SUPPLY SYNDICATE | 46.84 | |||||
| 68 | BLL/469 | 26-Nov-07 | FABRICATED ITEMS | NOS | 1000 | 1 | 5.12.2007 | 2 | N/A | N/A | L(1) | HR/43435,DT.15.12.07 | T.M.ENGG.WORKS | 0.55 | SEP'08 | ||||
| HR/43438 | INDIGENOUS ENGINEERS | 0.55 | " | ||||||||||||||||
| 69 | BLL/470 | 27-Nov-07 | CORK SHEET | NO | 60 | 1 | 5.12.07 | 3 | N/A | N/A | L(1) | HR/43489,DT.20.12.07 | COMMERCIAL SUPPLY SYND | 0.53 | OCT'08 | ||||
| FT | 400 | ||||||||||||||||||
| SF | 3580 | ||||||||||||||||||
| 70 | BLL/471 | 27-Nov-07 | IRON NAIL | KGS | 2850 | 1 | 5.12.2007 | 3 | N/A | N/A | L(1) | HR/43490, DT.20.12.07 | UTTAM ENTERPRISE | 1.12 | MAR'08 | ||||
| CNMBW | 71 | 9316/SP | 29/11/2007 | MAGNETIC WEDGE AS PER DIMENSION FOR STATOR | NO | 310 | SINGLE | 7/12/2007 | |||||||||||
| CN-SGW | 72 | BLL/472 | 28-Nov-07 | INDUSTRIAL XYLENE | LTR | 8650 | 1 | 6.12.2007 | 2 | N/A | N/A | L(1) | HR/43401,DT.14.12.07 | ESBEE INDUSTRIES | 5.24 | OCT'08 | |||
| ACETONE | |||||||||||||||||||
| CN_ADM | 73 | AD/ENQ/0390 | 7-Nov-07 | SNACKS PACKET | NO | 1 | 22-Nov-07 | 3 | 1) JANA ENTERPRISE, 2) DAY NIGHT CATERER & 3) GEMS | L1 | AD/HR/2068/WLF DT. 05.12.2007 | M/S JANA ENTERPRISE | 10.29 | YEARLY | |||||
| CN-ADM | 74 | AD/ENQ/0392 | 14-Nov-07 | BITUMEN (85/25 GRADE) | NO | 1 | 22-Nov-07 | 2 | 1) M/s STP LIMITED 2) M/S UNIVERSAL BITUMINOUS INDUSTRIES PRIVATE LTD. | L1 | AD/HR/2064/SER DT. 26.11.2007 | M/S UNIVERSAL BITUMINOUS INDUSTRIES PRIVATE LTD. | 0.65 | 30.11.2007 | |||||
| 75 | AD/ENQ/0393 | 14-Nov-07 | PLASTERING & WHITE WASHING OF ER SHOP | NO | 1 | 28-Nov-07 | 1) DUTTCON, 2) CHATTERJEE & DUTTA, 3) SHAHIN ENTERPRISE., 4) APEX CONSTRUCTION, 5) S S ENTERPRISE., 6) M C CONSTRUCTION, 7) S ENTERPRISE, 8) KALPANA TRADERS | L1 | AD/HR/2077/SER DT. 20.12.2007 | M/S KALPANA TRADERS | 0.69 | 60 DAYS | |||||||
| 76 | AD/ENQ/0400 | 26-Nov-07 | STATIONERY ITEMS | NO | 1 | 10-Dec-07 | 3 | 1) INDIAN ART PRESS, 2) COMPUTEC INDIA &3) A K PRINTERS | L1 | AD/HR/2090/STY DT. 01.01.08, AD/HR/2091/STY DT. 01.01.08, AD/HR/2092/STY DT. 01.01.08 | M/S INDIAN ART PRESS, M/S COMPUTEC INDIA & M/S A K PRINTERS | 0.57 | CONTINUOUS | ||||||
| CN-SGW | 77 | BLL/473 | 28-Nov-07 | BASE PLATE FOR LOCO MACHINING | NOS | 52 | 1 | 3.12.07 | 2 | N/A | N/A | L(1) | HR/43510,DT.22.12.2007 | STANDMECH ENGINEERING | 1.14 | ||||
| HR/43511, | BARIN BHATTACHARJEE | 0.77 | |||||||||||||||||
| 78 | BLL/474 | 29-Nov-07 | TRANSFORMER OIL | LTR | 8778 | 1 | 10.12.07 | 2 | N/A | N/A | L(1) | HR/43498, DT.20.12.07 | INDIAN PETRO PRODUCTS | 5.32 | OCT'08 | ||||
| 79 | BLL/475 | 29-Nov-07 | HOOP IRON 3/4" | KGS | 2099 | 1 | 7.12.2007 | 3 | N/A | N/A | L(1) | HR/43488, DT.20.12.07 | UTTAM ENTERPRISE | 1.13 | MAR'08 | ||||
| IM | 80 | ENQ/BLL/2007-08/7 | 27.11.2007 | Gogrej 2 Drawer Fire Resisting Filing Cabinet ( FRFC ) - Fire Resistant for 120 minutes | No | 1 | 1 | 10.12.2007 | 3 | 3 | NIL | L1 | IMCMP/C/2007-2008/4 dated 30.01.2008 | Godrej & Boyce Mfg. Co. Ltd. | 0.37729 | within 2 weeks | |||