| LIMITED Tenders/Contracts/Purchases of goods/services floated/awarded by the Company | |||||||||||||||||||
| Note: Only REGISTERED VENDORS may submit their quotation. For registration as vendor, please refer Vendor Registration Page under "Tender" from homepage. | |||||||||||||||||||
| Year | Month | LIMITED TENDERS FLOATED BY THE COMPANY | CONTRACTS AWARDED BY THE COMPANY | ||||||||||||||||
| Division | Sl.No. | Tender/Enquiry No. | Date of Publication of Tender/Enquiry | Item/Nature of Work | Type of Bidding (Single(1)/ Two Bid(2) System) | Last date of receipt of tender | No. of Tenders received | Nos. and names of parties qualified after technical evaluation | Nos. and names of parties not qualified after technical evaluation | Whether contract awarded to Lowest tenderer(L1)/ Evaluated L1(E1) | Contract No. and Date | Name of Contractor | Value of Contract (Rs.L) | Scheduled date of completion of supplies | |||||
| Description | Unit | Qty. | |||||||||||||||||
| 2007 | July | PR | 1 | PROJ/NASL/001 | 2-Jul-07 | Design Calculations : Electrical Works | LS | 1 | Single(1) | 11-Jul-07 | 4 | 2(UE Consultants & Engineers Private Ltd., Multicomp & Systems) | 2(S.S.D. Consulting Engineers, United Konsultants & Services) | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/002 Dt. 18.08.07 | UE Consultants & Engineers Private Ltd. | 511800 | 60 days from LOI | |
| Earthmat calculation for 33KV Switchyard | |||||||||||||||||||
| Lighting Calculation for Control Room Building | |||||||||||||||||||
| DSLP Calculation | |||||||||||||||||||
| Others, if any | |||||||||||||||||||
| Design Calculation : Civil & Structural Works | LS | 1 | |||||||||||||||||
| Design basis Report for Tower, Beam & Equipment structures and foundations, Control Room Building, Cable trench, Roads & other civil works | |||||||||||||||||||
| Design of 33KV Beams | |||||||||||||||||||
| Design of 33KV Towers | |||||||||||||||||||
| Design of Support structure for 33KV Isolators | |||||||||||||||||||
| Design of Support structure for CT | |||||||||||||||||||
| Design of Support structure for PT | |||||||||||||||||||
| Design of Support structure for LA | |||||||||||||||||||
| Design of Support structure for Bus Post Insulator | |||||||||||||||||||
| Design of foundations for 33KV Towers | |||||||||||||||||||
| Design of foundations for 33KV 10MVA Transformer | |||||||||||||||||||
| Design of foundation for 33KV Isolators | |||||||||||||||||||
| Design of foundation for 33KV CT | |||||||||||||||||||
| Design of foundation for 33KV PT | |||||||||||||||||||
| Design of foundation for 33KV LA | |||||||||||||||||||
| Design of foundation for 33KV Bus Post Insulator | |||||||||||||||||||
| Design of foundation of Cable Trench | |||||||||||||||||||
| Design of Control Room Building | |||||||||||||||||||
| Design of VHF Tower and High Mast | |||||||||||||||||||
| Others, if any | |||||||||||||||||||
| Engineering Drawings : Electrical Works | LS | 1 | |||||||||||||||||
| Single Line Diagram | |||||||||||||||||||
| Layout Plan and Section | |||||||||||||||||||
| Clearance Diagram | |||||||||||||||||||
| Outdoor Cable Trench Layout | |||||||||||||||||||
| Indoor Cable Trench Layout | |||||||||||||||||||
| Earthmat layout drawing for 33KV Switchyard | |||||||||||||||||||
| Equipment Earthing Philosophy and Details for 33KV Switchyard | |||||||||||||||||||
| 33KV Control Room Building Earthing Layout | |||||||||||||||||||
| Erection Key Diagram-Plan | |||||||||||||||||||
| Erection Key Diagram-Section | |||||||||||||||||||
| Structural layout for 33KV Switchyard | |||||||||||||||||||
| Main control room panel arrangement layout | |||||||||||||||||||
| Typical lighting notes and details | |||||||||||||||||||
| Outdoor lighting layout | |||||||||||||||||||
| Indoor lighting layout | |||||||||||||||||||
| Main control room lighting layout | |||||||||||||||||||
| DSLP Layout | |||||||||||||||||||
| Others, if any | |||||||||||||||||||
| Engineering Drawings : Civil & Structural works | LS | 1 | |||||||||||||||||
| Structural details of 33KV Beam | |||||||||||||||||||
| Structural details of 33KV Tower | |||||||||||||||||||
| Details of Support Structure for 33KV Isolator | |||||||||||||||||||
| Details of Support Structure for 33KV CT | |||||||||||||||||||
| Details of Support Structure for 33KV PT | |||||||||||||||||||
| Details of Support Structure for 33KV LA | |||||||||||||||||||
| Details of Support Structure for 33KV Bus Post Insulator | |||||||||||||||||||
| Details of foundation bolt for 33KV Towers | |||||||||||||||||||
| Details of foundation bolts for 33KV Equipments | |||||||||||||||||||
| Layout & Details of Foundations, Cable Trench & Drains | |||||||||||||||||||
| RCC details of foundation for 33KV Towers | |||||||||||||||||||
| RCC details of foundation for 33KV CT, PT, LA, Bus Post Insulator | |||||||||||||||||||
| RCC details of foundation for 33KV Isolator | |||||||||||||||||||
| RCC details of foundation for 33KV Circuit Breaker | |||||||||||||||||||
| RCC details of transformer foundation | |||||||||||||||||||
| RCC details of cable trench sections | |||||||||||||||||||
| Layout & details of road with parking | |||||||||||||||||||
| Layout & details of drain | |||||||||||||||||||
| Layout & details of Fencing & Gate | |||||||||||||||||||
| Control Room - Doors and Windown Details | |||||||||||||||||||
| Control room Finish schedule | |||||||||||||||||||
| Control room detail of toilet, plumbing & sewarage system layout | |||||||||||||||||||
| Control room foundation plan, layout of plinth beam and details of foundation, plinth beam and columns | |||||||||||||||||||
| Control room layout of plinth beams, plan at roof level and detail of lintel beam roof beam and roof | |||||||||||||||||||
| Control room layout and details of cable trench fixing detail of panels | |||||||||||||||||||
| Control details of septic tank and soak pit | |||||||||||||||||||
| Layout and details of guard room | |||||||||||||||||||
| Composite layout showing all the facilities building and installation | |||||||||||||||||||
| Fencing for substation boundary | |||||||||||||||||||
| Others, if any | |||||||||||||||||||
| Preparing and providing of work schedule and Bill of materials covering enter works in line with details given by client | LS | 1 | |||||||||||||||||
| Quality Assurance Plan of Bought out items | LS | 1 | |||||||||||||||||
| Quality Assurance Plan of Erection | LS | 1 | |||||||||||||||||
| Barchart / Contract network incorporating supply and erection. | LS | ||||||||||||||||||
| Getting approval of design/drawings/barchart, etc. relating to the NASL jobs | LS | 1 | |||||||||||||||||
| Providing technical specification of bought out items generally in line as described by NASL/NTPC in their specification. | LS | 1 | |||||||||||||||||
| Interaction with customers design cell for preparation and getting approval of items 1 to 9 mentioned above and as warranted by client. | LS | 1 | |||||||||||||||||
| PR | 2 | PROJ/DVC-BIADA/033 | 3-Jul-07 | A)Terminal Connectors for Equipment | Single(1) | 17-Jul-07 | 2 | 1)Designers & Engineers 2) Industrial Spare products | N/A | Yes | BLL/PROJ/DVC-BIADA/ORD/035, DT-07.08.07 | Designers & Engineers | 4.03 | 8/12 weeks from the date of approval of drawings | |||||
| Expansion type connectors for station service transformer H.V bushing suitable for 11/2" Al. Pipe | Nos. | 6 | |||||||||||||||||
| Expansion type connector fro 33KV SF6 breaker suitable for 11/2" IPS Al.Tube and 1250 Amps continious current. | Nos. | 42 | |||||||||||||||||
| Connectors for 33 KV normal Isolator | |||||||||||||||||||
| Rigid type suitable for 2 1/2" IPS Al. Tube (2000 Amps. continious current) | Nos. | 6 | |||||||||||||||||
| Expansion type suitable for 2 1/2" IPS Al. Tube (2000 Amps. continious current) | Nos. | 6 | |||||||||||||||||
| Rigid type suitable for 1-1/2" IPS Al. Tube (1250 Amps. continious current) | Nos. | 12 | |||||||||||||||||
| Expansion type suitable for 1-1/2" IPS Al. Tube (1250 Amps. continious current) | Nos. | 90 | |||||||||||||||||
| Clamp type connector for terminal isolator suitable for panther conductor | Nos. | 24 | |||||||||||||||||
| Rigid type 33KV CT connector suitable for CT stud to 1-1/2" IPS Al. Tube (1250A continious current) | Nos. | 42 | |||||||||||||||||
| B)Connector and conductor accessories as per technical specifications. | |||||||||||||||||||
| Bus support connector for 2-1/2" IPS Al. pipe(Rigid) suitable for 2000 Amps. Continious current. | Sets | 12 | |||||||||||||||||
| Bus support connector for 2-1/2" IPS Al. pipe(Flexible) suitable for 2000 Amps. Continious current. | Sets | 12 | |||||||||||||||||
| Bus support connector for 2-1/2" IPS Al. pipe(End Free) suitable for 2000 Amps. Continious current. | Sets | 12 | |||||||||||||||||
| Bus support connector for 1-1/2" IPS Al. pipe(Rigid) | Sets | 13 | |||||||||||||||||
| Bus support connector for 1-1/2" IPS Al. pipe(Flexible) | Sets | 13 | |||||||||||||||||
| Bus support connector for 1-1/2" IPS Al. pipe(End Free) | Sets | 12 | |||||||||||||||||
| Tee connector from 2-1/2" Al. Pipe 1-1/2" Al. Pipe | Sets | 39 | |||||||||||||||||
| Tee connector from 1-1/2" Al. Pipe to AAAC Panther | Sets | 6 | |||||||||||||||||
| Straight through coupler for 2-1/2" Al.pipe | Sets | 6 | |||||||||||||||||
| Straight through coupler for 1-1/2" Al.pipe | Nos. | 15 | |||||||||||||||||
| End Plug for 2-1/2" Al.pipe | Nos. | 30 | |||||||||||||||||
| End Plug for 1-1/2" Al.pipe | Nos. | 6 | |||||||||||||||||
| P.G clamp Dog to Dog | Nos. | 12 | |||||||||||||||||
| P.G clamp Panther to Panther | Nos. | 12 | |||||||||||||||||
| CNMBW | 3 | PUR/9005/AS | 3/7/2007 | DGC CU.COND.CL-F,G2 (1.40 X 3.70 +- 0.5) IS 4685 | KG | 200 | 1 | 9/7/2007 | 3 | PARAMOUNT CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS (P)LTD. | NIL | L-1 | MB/11166/ER DT: 27/07/07 | SWARNA GIRI WIRE INSULATION PVT,LTD. | 95358.05 | 4 WEEKS FROM THE DATE OF RECEIPT OF ORDER | |||
| CNMBW | 4 | PUR/9006/AS | 3/7/2007 | Bare copper cond. SIZE(4.9X30)MM2 AS PER IS 61`60 | kg | 80 | 1 | Below Rs.50000/- | |||||||||||
| CNMBW | 5 | PUR/9007/AS | 3/7/2007 | EN DGC COND.(8.4X2.8)MM2 EIGI,H | KG | 90 | 1 | Below Rs.50000/- | |||||||||||
| CNMBW | 6 | PUR/9008/AS | 3/7/2007 | EN DGC COND.( 3.45 X 12.25)MM2 EIGI,H | KG | 170 | 1 | Cancelled by ERW on 17/07/07 | |||||||||||
| CNMBW | 7 | PUR/9009/AS | 3/7/2007 | KAPTON COVER COPPER COND. (2.7 X 7.00 +- 0.5) IS 9148-1979 | KG | 440 | 1 | ||||||||||||
| CNMBW | 8 | PUR/9010/AS | 3/7/2007 | MFG OF NEW SILVER BEARING COMMUTATOR ( SEGMENT: 150 ) | NO | 4 | 1 | 10/7/2007 | SINGLE | THE BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA) | NIL | L-1 | MB/11138/ER DT.21/07/07 | THE BENGAL COMMUTATORS WORKS | 476320 | WITHIN 60 DAYS | |||
| CNMBW | 9 | PUR/9011/AS | 3/7/2007 | MFG OF NEW COMMUTATOR (SEGMENT: 150 ) | NO | 1 | 1 | 10/7/2007 | SINGLE | THE BENGAL COMMUTATOR WORKS, DOLPHIN ELECTRIC (INDIA) | NIL | L-1 | MB/11141/ER DT.21/07/07 | THE BENGAL COMMUTATOR WORKS | 213200 | WITHIN 45 DAYS | |||
| CNMBW | 10 | PUR/9012/AS | 3/7/2007 | NEW COMMUTATOR WITH SILVER BR.COPPER SEGMENT-162 | N0 | 1 | 1 | Cancelled by ERW on 17/07/07 | |||||||||||
| CN-SGW | 11 | BLL/321 | 5-Jul-07 | PHTHALIC ANHYDRIDE (HARDENER) | KGS | 3500 | 1 | 2 | N/A | N/A | L(1) | HR/42695, DT.26.7.07 | BHARAT MERCANTILE CORPN. | 2.88 | OCT'07 | ||||
| CNMBW | 12 | PUR/9013/AS | 7/7/2007 | MICAPAG SAMICA THERM TAPE 25MMX0.18MMX50MT | RL | 200 | SINGLE | 13/07/07 | Below Rs.50000/- | ||||||||||
| CNMBW | 13 | PUR/9014/AS | 7/7/2007 | EN.DGC.CU COND.(4.0+-05X2.6+-03)MM2 | KG | 400 | SINGLE | 13/07/07 | 4 | PARAMOUNT CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS (P)LTD.PEARL INSULATIONS PVT.LTD | NIL | L-1 | MB/11165/ER DT: 27/07/2007 | M/S SWARNA GIRI WIRE INSULATIONS PVT.LTD. | 195515 | 4 WEEKS FROM THE DATE OF RECEIPT ORDER | |||
| CNMBW | 14 | PUR/8998/SP | 7/7/2007 | LABOUR CHARGES FOR FORMING OF ARMATURE COILS AS PER SAMPLE. | NO | 250 | 1 | 16/07/07 | 2 | CHILMECH TECHNO PVT. LTD. & MA-KALI ENGG. WORKS. | NIL | L1 | MB/11360/ER | MA-KALI ENGG. WORKS | 64000.00 | 15 DAYS FROM THE DATE OF ORDER | |||
| PP/LOBP | 15 | PP/LBO/POUCH BID-2 | 9.7.2007 | Laminated and printed plastic pouches | per 100 pcs | As per requirement | Two(2) Bid | 20.7.2007 | |||||||||||
| CNMBW | 16 | PUR/9025/AS | 10/7/2007 | BARE, CU COND (2-5X44-75)MMFOR IPCOIL-IS 6160 | KG | 250 | SINGLE | 16/07/07 | |||||||||||
| CNMBW | 17 | PUR/9026/AS | 10/7/2007 | DGC COPPER COND FOR MAIN POLE COIL | KG | 1000 | SINGLE | 16/07/07 | 3 | PARAMOUNT CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS (P)LTD. | NIL | L-1 | MB/11167/ER DT: 28/07/07 | SAGUN COPPER COND.PVT.LTD. | 472003.28 | 3 WEEKS FROM THE DATE OF RECEIPTS OF ORDER. | |||
| CNMBW | 18 | PUR/9027/AS | 10/7/2007 | EN.COPPER COND AS IS-3855, GR OF COVERING-E2 | KG | 220 | SINGLE | 16/07/07 | 3 | PARAMOUNT CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS (P)LTD. | NIL | L-1 | MB/11168/ER DT: 27/07/07 | SWARNA GIRI WIRE INSULATIONS PVT. LTD. | 107797.24 | 4 WEEKS FROM THE DATE OF RECEIPTS OF ORDER. | |||
| CNMBW | 19 | PUR/9028/AS | 10/7/2007 | MFG OF NEW COMMUTATOR AS PER SAMPLE/DRAWING | NO | 4 | SINGLE | 16/07/07 | SINGLE | THE BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA) | NIL | L-1 | MB/11140/ER DT.21/07/07 | THE BENGAL COMMUTATORS WORKS | 353600 | WITHIN 60 DAYS | |||
| CNMBW | 20 | PUR/9029/AS | 10/7/2007 | ROLLOR BEARING HU-318.03, | N0 | 4 | SINGLE | 17/07/07 | |||||||||||
| CNMBW | 20 | PUR/9029/AS | 10/7/2007 | ROLLER BEARING NO-UI318.MR089 | NO | 4 | SINGLE | 17/07/07 | |||||||||||
| 21 | AD/ENQ/0337 | 10/7/2007 | LABOUR CHARGE FOR BITUMEN PAINTING | SINGLE | 17.07.07 | 2 | 1) SUNITI NASKAR 2) DUTTCON | N/A | L1 | AD/HR/2022/SERDT. 25.07.2007 | M/S SUNITI NASKAR | 0.45 | |||||||
| CNMBW | 22 | PUR/9030/AS | 11/7/2007 | SILVER BRG.COMMUTATOR AS PER DIMENSION.232 SEG. | NO | 1 | SINGLE | 17/07/07 | SINGLE | THE BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA) | NIL | L-1 | MB/11139/ER DT.21/07/07 | THE BENGAL COMMUTATORS WORKS | 78000 | WITHIN 45 DAYS | |||
| CNMBW | 23 | PUR/9035/AS | 11/7/2007 | 35 SQ. MM A.T.C.C. 6.6KV GR.SINGLE CORE CABLE | MT | 100 | SINGLE | 18/07/07 | |||||||||||
| CN-SGW | 24 | BLL/322 | 12-Jul-07 | FRONT CONNECTED FUSE | NOS | 9429 | 1 | 26-Jul-07 | 4 | N/A | N/A | L(1) | HR/42772, DT.22.8.07 | GENERAL AGENCY & TRADING C0. | 2.9 | SEP'08 | |||
| CN-SGW | 25 | BLL/323 | 12-Jul-07 | POWER PACK | NOS | 70 | 1 | 19-Jul-07 | CANCELLED | ||||||||||
| CNMBW | 26 | 9036/AS | 13/07/07 | CENTRIFUGAL PUMP (BE MAKE) MODEL NO: M822KK, 3" X3" 10 HP. AC 3 PHASE 50 HZ 415 VOLT 1450 RPM TEFC. | NO | 1 | 1 | 20/07/2007 | |||||||||||
| CNMBW | 27 | 9038/AS | 13/07/07 | MFG OF NEW COMMUTATOR AS PER SAMPLE. SEG:139 | NO | 2 | SINGLE | 20/07/07 | 3 | THE BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA)COMMUTATOR MFG. | NIL | L-1 | MB/11169/ER DT: 27/07/2007 | THE BENGAL COMMUTATORS WORKS | 82274.4 | 45 DAYS FROM THE DATE OF RECEIVED OF SAMPLE | |||
| CNMBW | 28 | 9040/AS | 13/07/07 | ENAMELLED COPPER CONDUCTOR(1.78X3.00)MM2,E2,F | KG | 360 | SINGLE | 19/07/07 | 2 | PARAMOUNT CONDUCTORS LT. SAGUN COPPER CONDUCTORS (P)LTD. | NIL | L-1 | MB/11164/ER DT: 28/07/2007 | SAGUN COPPER COND.PVT.LTD. | 180105.56 | 3 WEEKS FROM THE DATE OF RECEIPTS OF ORDER. | |||
| CNMBW | 29 | 9041/AS | 13/07/07 | ROLLER BEARING NJ 2316 E C3.(SKF/FAG) | NO | 8 | SINGLE | 20/07/07 | |||||||||||
| PR | 30 | PROJ/DVC-BIADA/034 | 16-Jul-07 | Battery Charger as per technical specification for 48 Volt , 200AH Exide make Battery set. | set | 1 | Single(1) | 27-Jul-07 | 2 | 1)Chabbi Electricals Pvt Ltd. 2) Caldyne Automatics Ltd. | N/A | Yes | BLL/PROJ/DVC-BIADA/ORD/037, DT-06.09.07 | M/s Caldyne Automatics Ltd. | 2.18 | 8-10 weeks from date of approval of drawings/GTP. | |||
| CNMBW | 31 | 9060/SP | 16/07/07 | MFG OF ARMATURE SHAFT AS PER DRG. MAX.CO OF SHAFT : 115MM. MAX.LENGTH : 1325MM. MATERIAL : EN24. SHAFT SHOULD BE GRIND FINISH. BOTH SIDE END JAM NUT WILL BE SUPPLIED BY PARTY ALONG WITH SHAFT. PARTY SHOULD BE CARRIEDOUT MATERIAL COMPOSITION TEST,ULTRA SONIC TEST,HARONESS TEST FROM GOVT.APPROVED LAB AND ALL TEST REPORT WILL BE SUPPLIED AT THE TIME OF DELIVERY. OLD SAMPLE WILL BE SUPPLIED US TO THE ELIGIBLE CONTRACTOR. FINAL DRAWING WILL BE SUPPLIED BY US LATER ON. | NO | 2 | SINGLE | 23/07/07 | |||||||||||
| CNMBW | 32 | 9042/SP | 16/07/07 | Mfg. Of Armature Shaft as per Drawing. Max OD:110 MM Length: 1291 mm. Material: EN-24. Material composition Test USG test X-Ray report should be carried out from GOVT.Test Laboratory. Test repot should be submitted by party at the time of Delivery.Drawing of Shaft is enclosed here with. | NO | 5 | SINGLE | 23/07/07 | 3 | ESDEE ELECTROMILL PVT.LTD.,J.S.INDUSTRIES, MA-KALI ENGG.WORKS | NIL | L-1 | MB/11197/ER DT.04/08/07 | MA-KALI ENGG.WORKS | 85800 | WITHIN 21 DAYS FROM THE DATE OF ORDER 2 NOS. SHAFT AND BALANCEWITHIN 30/08/07 | |||
| CN-SGW | 33 | BLL/324 | 17-Jul-07 | PACKING CHUTE/BOX | SETS | 150 | 1 | 24-Jul-07 | 2 | N/A | N/A | L(1) | hr/42715,dt.31.7.07 | HASSAN BROTHERS | 1.71 | DEC'07 | |||
| NOS | 150 | ||||||||||||||||||
| CNMBW | 34 | 9053/AS | 18/07/07 | ROLLER BEARING NJ-317 (SKF/FAG) | NO | 4 | 1 | 25/07/07 | |||||||||||
| CNMBW | 34 | 9054/AS | 18/07/07 | MFG OF SILVER BEARING COMMUTATOR AS PER SAMPLE | NO | 2 | 1 | 24/07/07 | 3 | THE BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA)COMMUTATOR MFG. | NIL | L-1 | MB/11177/ER DT.31/07/07 | COMMUTATOR MFG. | 76960.00 | WITHIN 30 DAYS FROM THE DATE OF RECEIVED SAMPLE. | |||
| CNMBW | 36 | 9054/AS | 19/07/07 | Mfg. Of new Commutator as per sample. Segment: 162 secment dia: 407mm Riser dia: 487mm Riser thickness: 20mm Segment Length : 230 mm. Material: Silver Bearing copper. Steel Hub to be New which will be supply by Party. | NO | 1 | 1 | 24/07/07 | 3 | THE BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA)COMMUTATOR MFG. | NIL | L-1 | MB/11177/ER DT.31/07/07 | COMMUTATOR MFG. | 76960 | WITHIN 30 DAYS FROM THE DATE OF RECEIVED SAMPLE. | |||
| CN-SGW | 37 | BLL/325 | 20-Jul-07 | TOOLS | NOS | 74 | 1 | 27-Jul-07 | |||||||||||
| CNMBW | 38 | 9067/AS | 19/07/07 | Centrifugal Pump BE Make Model No:MB22KK,3"x3" 110 HP.AC 3 Phase.50HZ , 415 v, 1450 RPM TEFC. | NO | 1 | 1 | 23/07/07 | |||||||||||
| CNMBW | 39 | 9068/sp | 20/07/2007 | HEAVY DUTY LATHE 6 TON CAPACITY. Deatail Description: Centre height: 675mm Job dia over carriage -1100MM Admit Between centre : 3.0MT, Bed width 0.75MT.(approx) Spindle Bore -105 MM (Approx) Bed Length: 5MT, Weight carrying capacity: 6.00 Tons. Power-15HP. 4-jaw Independent Dog Chuck Size 24" Double slot. | NO | 1 | 1 | 30/07/07 | 3 | HMT MACHINE TOOLS LIMITED, CHAITANYA MACHINE TOOLS INDUSTRIES, GOLDENMECHINEX CORPORATION. | NIL | L-1 | MB/11368/CAP DT:13/11/2007 | GOLDEN MACHINEX CORPORATION. | 1034800.00 | 4 MONTHS FROM THE DATE OF MANUFACTURING CLEARENCE | |||
| CN-SGW | 40 | BLL/326 | 23-Jul-07 | M/C. COMPONENTS | NOS | 2915 | 1 | 2-Aug-07 | 4 | N/A | N/A | L(1) | HR/42788, DT.24.8.07 | T.M.ENGG.WORKS | 0.077 | OCT'07 | |||
| HR/42789, DT.24.8.07 | STANDMECH ENGINEERING | 0.26 | " | ||||||||||||||||
| HR/42790, DT.24.8.07 | NAVA BHARAT ENTERPRISE | 0.24 | " | ||||||||||||||||
| HR/42787,DT.24.08.07 | TAPATI ELECTRICALS | 0.17 | " | ||||||||||||||||
| CNMBW | 41 | 9074/AS | 24/07/07 | DUAL COAT ENAMELLED COPPER WIRE,DIA:3.32 MM Class :H IS 13730 -1973 | KG | 250 | SINGLE | 30/07/07 | 3 | PARAMOUNT CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS (P)LTD. | NIL | L-1 | MB/11195/ER DT: 04/08/07 | SAGUN COPPER CONDUCTORS LTD | 124905.35 | 15 DAYS FROM THE DATE OF RECEIPT ORDER | |||
| CNMBW | 42 | 9075/AS | 24/07/07 | BARE, BRIGHT, VACUUM ANNEALED CU COND (6.25X50.5) MM2 AS PER :IS 6160 | KG | 180 | SINGLE | 30/07/07 | 1 | PARAMOUNT CONDUCTORS LT. | NIL | L-1 | MB/11194/ER DT: 204/08/2007 | PARAMOUNT CONDUCTORS LTD | 134415 | 15 DAYS | |||
| CNMBW | 43 | 9076/AS | 24/07/07 | 35 SQ. MM A.T.C.C. 6.6 KV GR. SINGLE CORE CABLE CLASS:F, CABLE SHOULD STAND 18 KV AC FOR 1 MIN. | MT | 100 | SINGLE | 31/07/07 | |||||||||||
| CN-SGW | 44 | BLL/327 | 25-Jul-07 | M/C. COMPONENTS | NOS | 660 | 1 | 4-Aug-07 | 2 | N/A | N/A | L(1) | HR/42785,DT.24.8.07 | NAVA BHARAT ENTERPRISE | 0.27 | OCT'07 | |||
| HR/42784,DT.24.8.07 | TAPATI ELECTRICALS | 0.22 | " | ||||||||||||||||