| LIMITED Tenders/Contracts/Purchases of goods/services floated/awarded by the Company | ||||||||||||||||||||
| Note: Only REGISTERED VENDORS may submit their quotation. For registration as vendor, please refer Vendor Registration Page under "Tender" from homepage. | ||||||||||||||||||||
| Year | Month | LIMITED TENDERS FLOATED BY THE COMPANY | CONTRACTS AWARDED BY THE COMPANY | |||||||||||||||||
| Division | Sl.No. | Tender/Enquiry No. | Date of Publication of Tender/Enquiry | Item/Nature of Work | Type of Bidding (Single(1)/ Two Bid(2) System) | Last date of receipt of tender | No. of Tenders received | Nos. and names of parties qualified after technical evaluation | Nos. and names of parties not qualified after technical evaluation | Whether contract awarded to Lowest tenderer(L1)/ Evaluated L1(E1) | Contract No. and Date | Name of Contractor | Value of Contract (Rs.L) | Scheduled date of completion of supplies | ||||||
| Description | Unit | Qty. | ||||||||||||||||||
| 2008 | Feb | PR | 1 | PROJ/NASL/056A | 1-Feb-08 | Survey of 33KV Line and Peg marking on 13 mtr. Rail pole location as per enclosed BLL's drawing | km | 3.5 | Single(1) | 8-Feb-08 | 3 | 3 (Subodh Kumar Construction, Maa Bhawani Construction, Hari Om Construction) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/041 Dt. 13.02.08 | Hari Om Construction | 564450 | 30 days | ||
| Erection of 13 Mtr. (60kg/mtr) Rail Pole(double) as per enclosed BLL's drawing no. NASL/NESCL/RANCHI/ EL/001 for 33 KV O/H line along with painting by one coat of Red oxide primer and two coat of Aluminium paint . | No. | 45 | ||||||||||||||||||
| Erection of 33KV Stay Set complete as per enclosed BLL's drawing no. NASL/NESCL/RANCHI/EI/TL/005 (Rev. 01) | No. | 200 | ||||||||||||||||||
| PR | 2 | PROJ/NASL/056B | 1-Feb-08 | Rail Poles 35 nos., (13 mtr., 60kg/mtr.) and as per enclosed Technical Specification | MT | 27.300 | Single(1) | 7-Feb-08 | 2 | 2 (Narindra & Narindra Steel Corporation, Shree Nakoda Steel) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/042 Dt. 13.02.08 | Narindra & Narindra Steel Corporation | 1162161 | 7 days | ||||
| CNMBW | 3 | 9360/JC | 02-02-08 | MAGNATIC WEDGE AS PER DIMENTION FOR STATOR. | NO | 300 | SINGLE | 22/02/08 | ||||||||||||
| CNMBW | 4 | 9490/JC | 02-02-08 | MFG. OG ARMATURE SHAFT. | NO | 2 | SINGLE | 20/02/08 | ||||||||||||
| CNMBW | 5 | 9491/JC | 02-02-08 | MFG. OG ARMATURE SHAFT. | NO | 4 | SINGLE | 20/02/08 | ||||||||||||
| CN-SGW | 6 | BLL/518 | 5-Feb-08 | M/C. & PRESS COMP | NOS | 1600 | 1 | 12.2.08 | ||||||||||||
| CNMBW | 7 | 9407/JC | 04-02-08 | LABOOUR CH. FOR REWIND -ING OF ARM & UNDERCUTTING COMM. | NO | 6 | SINGLE | 12/02/08 | 2 | 1.MA-KALI ENGINEERING WORKS. 2.PREMIER DIESELS PVT. LTD. | NIL | L-1 | MB/11740/ER Dt.12-03-08 | MA-KALI ENGINEERING WORKS. | 56400.00 | 10 DAYS FOR EACH ARMATURE FROM THE DATE OF RECEIVE ARMATURE. | ||||
| CNMBW | 8 | 9408/JC | 04-02-08 | LABOOUR CH. FOR REWIND -ING OF ARM & UNDERCUTTING COMM. | NO | 6 | SINGLE | 12/02/08 | 2 | 1.MA-KALI ENGINEERING WORKS. 2.PREMIER DIESELS PVT. LTD. | NIL | L-1 | MB/11697/ER Dt.29-02-08 | PREMIER DIESELS PVT. LTD. | 57000.00 | 10 DAYS FOR EACH ARMATURE FROM THE DATE OF RECEIVE ARMATURE. | ||||
| CNMBW | 9 | 9408/JC | 04-02-08 | LABOOUR CH. FOR REWIND -ING OF ARM & UNDERCUTTING COMM. | NO | 6 | SINGLE | 12/02/08 | ||||||||||||
| PR | 10 | PROJ/DVC-BIADA/061 | 7-Feb-08 | Supply of GI Bolts,Nuts with washer as per following | Single(1) | 14-Feb-08 | ||||||||||||||
| 1) 12mm dia , 40mm long only Bolt with Spring washer | Pcs | 500 | ||||||||||||||||||
| 2) 12mm dia , 40mm long Nut Bolt with washer | Pcs | 650 | ||||||||||||||||||
| 3) 12mm dia , 50mm long Nut Bolt with washer | Pcs | 350 | ||||||||||||||||||
| 4) 16mm dia , 90mm long Nut Bolt with washer | pcs | 110 | ||||||||||||||||||
| CNMBW | 11 | 9504/JC | 07-02-08 | MICA UNDERCUTTING MACHINE FOR ARMATURES. | NO | 1 | SINGLE | 17/02/08 | ||||||||||||
| CNMBW | 12 | 9512/AS | 07-02-08 | DGC COPPER COND FOR MAIN POLE COIL. (3.2X7)MM2. | KG | 260 | SINGLE | 13/02/08 | 2 | 1.PARAMOUNT CONDUCTORS LTD. 2.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | SAGUN COPPER CONDUCTORS(P) LTD. | MB/11642/ER dt.20-02-08. | 113606.16 | WITHIN 15 DAYS. | ||||
| CNMBW | 13 | 9516/AS | 07-02-08 | DUAL COAT ENAMELLED COPPER WIRE.14SWG. | KG | 140 | SINGLE | 13/02/08 | 2 | 1.PARAMOUNT CONDUCTORS LTD. 2.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | SAGUN COPPER CONDUCTORS(P) LTD. | MB/11641/ER dt.20-02-08. | 67891.11 | WITHIN 15 DAYS. | ||||
| CNMBW | 14 | 9517/AS | 07-02-08 | EN DGC COND (2.5X5.0)MM2. E2G1.F. | KG | 260 | SINGLE | 13/02/08 | 2 | 1.PARAMOUNT CONDUCTORS LTD. 2.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | SAGUN COPPER CONDUCTORS(P) LTD. | MB/11643/ER dt.20-02-08. | 115165.82 | WITHIN 15 DAYS. | ||||
| CN-SGW | 15 | BLL/519 | 7-Feb-08 | FASTENERS | NOS | 48600 | 1 | 14.2.08 | 2 | N/A | N/A | L(1) | HR/43887, DT.29.2.08 | B.B.GHOSH | 0.14 | SEP'08 | ||||
| HR/43888 | WESTERN TRADING CORPN | 0.2 | ||||||||||||||||||
| 16 | BLL/520 | 7-Feb-08 | FASTENERS | NOS | 60274 | 1 | 14.2.08 | 3 | N/A | N/A | L(1) | HR/43882,DT.28.2.08 | WESTERN TRADING CORPN | 0.35 | SEP'08 | |||||
| HR/43883 | SANJAY HARDWARE AGENCY | 0.23 | ||||||||||||||||||
| 17 | BLL/521 | 7-Feb-08 | FABRICATED COMP | NOS | 305 | 1 | 13-2-08 | 3 | N/A | N/A | L(1) | HR/43872, DT.27.02.2008 | NAVA BHARAT ENTERPRISE | 1.01 | ||||||
| PR | 18 | PROJ/NASL/057 | 8-Feb-08 | Engineering Drawings : 33KV Line Work | Single(1) | 14-Feb-08 | 2 | 2 (UE Consultants & Engineers Pvt. Ltd., Multicomp & Systems) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/052 Dt. 18.04.08 | UE Consultants & Engineers Pvt. Ltd. | 122192 | 21 days | ||||||
| Span of Line & support | LS | 1 | ||||||||||||||||||
| Sag Tension Design calculation | LS | 1 | ||||||||||||||||||
| Pipe Earthing arrangement drawing | LS | 1 | ||||||||||||||||||
| Rod Earthing details | LS | 1 | ||||||||||||||||||
| Foundation details of 13M Rail Pole | LS | 1 | ||||||||||||||||||
| Stayset arrangement with foundation detail | LS | 1 | ||||||||||||||||||
| Detail of Danger Board | LS | 1 | ||||||||||||||||||
| Protective Guarding arrangement | LS | 1 | ||||||||||||||||||
| Single Pole suspension arrangement with 90KN Disc Insulator | LS | 1 | ||||||||||||||||||
| Double pole tension arrangement with 90KN Disc Insulator | LS | 1 | ||||||||||||||||||
| End Pole structure (with cable termination arrangement) | LS | 1 | ||||||||||||||||||
| Road crossing arrangement | LS | 1 | ||||||||||||||||||
| Power line crossing arrangement | LS | 1 | ||||||||||||||||||
| 33KV Double Pole Top member fabrication details | LS | 1 | ||||||||||||||||||
| 33KV Double Pole cross bracing fabrication details | LS | 1 | ||||||||||||||||||
| 33KV Line Single Pole cross arm fabrication details | LS | 1 | ||||||||||||||||||
| Fabrication detail of Pole clamp for horizontal formation | LS | 1 | ||||||||||||||||||
| Fabrication detail of Pole Clamp for vertical formation | LS | 1 | ||||||||||||||||||
| Fabrication detail of back clamp | LS | 1 | ||||||||||||||||||
| Detail of earthing arrangement for Double Pole location | LS | 1 | ||||||||||||||||||
| Formation and arrangement of Guys at the following | ||||||||||||||||||||
| Single pole location, double pole angle location & double pole dead end location | LS | 1 | ||||||||||||||||||
| Drawing for Guy assembly complete | LS | 1 | ||||||||||||||||||
| Drawing for Fly Guy and Bow Guy | LS | 1 | ||||||||||||||||||
| Drawing for Turn buckle | LS | 1 | ||||||||||||||||||
| Double pole arrangement with 11KV AB Switch, HG Fuse & LA for 200 KVA station transformer and its fabrication details. | LS | 1 | ||||||||||||||||||
| CNMBW | 19 | 9523/AS | 09-02-08 | EN DGC CU COND (4.0+- .05 X 2.61+-.03) MM2. | KG | 215 | SINGLE | 14/02/08 | 2 | 1.PARAMOUNT CONDUCTORS LTD. 2.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | SAGUN COPPER CONDUCTORS(P) LTD. | MB/11639/ER dt.20-02-08. | 100134.00 | WITHIN 15 DAYS. | ||||
| CNMBW | 20 | 9524/AS | 09-02-08 | EN DGC CU COND (1.85 X 3.55 ) MM2.E2G1, H | KG | 130 | SINGLE | 15/02/08 | 3 | 1.PARAMOUNT CONDUCTORS LTD. 2.SWARNAGIRI WIRE INSULATIONS PVT. LTD. 3.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | SAGUN COPPER CONDUCTORS(P) LTD. | MB/11640/ER dt.20-02-08. | 62573.85 | WITHIN 15 DAYS. | ||||
| CN-SGW | 21 | BLL/522 | 12-Feb-08 | PVC BARRIER/COVER | NOS | 2272 | 1 | 20-02-08 | 2 | N/A | N/A | L(1) | hr/43896. Dt.3.3.08 | MODOPLAST CO | 9.1 | SEP'08 | ||||
| 22 | BLL/523 | 12-Feb-08 | FASTENERS | NOS | 36500 | 1 | 18-02-08 | CANCELLED | ||||||||||||
| 23 | BLL/524 | 13-Feb-08 | CABLE GLAND | NOS | 192 | 1 | 20-02-08 | |||||||||||||
| CNMBW | 24 | 9518/AS | 13-02-08 | BALL BEARING 6324 (SKF/FAG) | NO | 1 | SINGLE | 20/02/08 | 3 | 1.ISHAN INTERNATIONAL | NIL | L - 1 | ISHAN INTERNATIONAL | MB/11688/ER dt.28-02-08 | 26260.00 | WITHIN 20 DAYS. | ||||
| ROLLER BEARING NU-324 (SKF/FAG). | NO | 1 | 2.SUTCO BEARING INDIA PVT. LTD. 3.UDAY ENTERPRISE. | |||||||||||||||||
| CNMBW | 25 | 9521/AS | 13-02-08 | MFG OF SILVER BEARING COMMUTATOR OF 171 SEG. | NO | 2 | SINGLE | 20/02/08 | 3 | 1.THE BENGAL COMMUTATOR WORKS. 2.COMMUTATOR MFG. 3.SAHNEY COMMUTATORS PVT. LTD. | NIL | L-1 | SAHNEY COMMUTATORS PVT. LTD. | MB/11714/ER dt.05-03-08. | 107976.96 | WITHIN 6 WEEKS. | ||||
| CNMBW | 26 | 9522/AS | 13-02-08 | MFG OF NEW COMMUTATOR AS PER SAMPLE / DRAWING. | NO | 2 | SINGLE | 20/02/08 | 1 | 1.THE BENGAL COMMUTATOR WORKS. | NIL | L-1 | THE BENGAL COMMUTATOR WORKS. | MB/11685/ER dt.28-02-08. | 178880.00 | WITHIN 30 DAYS. | ||||
| PR | 27 | PROJ/NASL/058 | 12-Feb-08 | 37/3.0 mm ACSR (Panther) Conductor for use on 33KV Transmission lines as per enclosed Technical Specification | Km. | 2 | Single(1) | 19-Feb-08 | 1 | 1 (Mehra Electric Co.) | nil | BLL/PROJ/NASL-R/ORD/045 dtd. 26.02.08 | Mehra Electric Co. | 235152 | 7 days from order/inspection | |||||
| CNMBW | 28 | 9515/JC | 12-02-08 | LAB. CH. FOR RECONDITIONING OF ROTOR & STATOR. | NO | 1 | SINGLE | 19/02/08 | ||||||||||||
| CNMBW | 29 | 9517/JC | 12-02-08 | LABOUR CHARGES FOR SAMICA THREM MOULDING OFST. COIL. | NO | 240 | SINGLE | 23/02/08 | 3 | 1.B.P.ENTERP RISE. 2.BALAKA ENTERPRISE. 3.EMIC MOTORS (P) LTD. | NIL | L-1 | B.P.ENTERPRISE | MB/11696/ER Dt.29-02-08. | 58656.00 | WITH IN 14 DAYS FROM THE DATE OF APPROVED SAMPLE. | ||||
| PR | 30 | PROJ/DVC-BIADA/062 | 14-Feb-08 | 50mm x6mm Hot dip Galvanised G.I Strip as per IS:2629-1966 (Rate of Galvanisation 610gm/sq mtr) for earthing of structures and equipments. | Mtr | 950 | Single(1) | 22-Feb-08 | 3 | 3 (Maabhawani Construction, Subodh Kumar Singh Construction, Hi-Tech Electro Mechanicals) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/051 Dtd. 18.04.08 | Hi-Tech Electro Mechanicals | 55000 | 45 days | ||||
| 31 | PROJ/DVC-BIADA/063 | 14-Feb-08 | 40 mm dia M.S Rod | MT | 23 | Single(1) | 22-Feb-08 | 1 | M/s Narindra & Narindra Steel Corporation | NIL | Lowest(L1) | BLL/PROJ/DVC-BIADA/ORD/060, dt. 08.04.08 | M/s Narindra & Narindra Steel Corporation | 1070215 | Within 7 days from the date of faxing of cheque. | |||||
| CNMBW | 32 | 9530/AS | 18-02-08 | EN DGC CU COND(1.55X6.0) MM2. E1G1.H. IS10114. | KG | 150 | SINGLE | 23/02/08 | 3 | 1.PARAMOUNT CONDUCTORS LTD. 2.SWARNAGIRI WIRE INSULATIONS PVT. LTD. 3.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | SAGUN COPPER CONDUCTORS(P) LTD. | MB/11682/ER dt.28-02-08. | 75799.82 | WITHIN 15 DAYS. | ||||
| CN-SGW | 33 | BLL/525 | 19-Feb-08 | SILICONE GREASE/ METROARK 17 COMPND. | KGS | 400 | 1 | 28.02.2008 | 3 | N/A | N/A | L(1) | HR/43895,DT.1.3.08 | WACKER METROARK CHEMICALS PVT.LTD | 1.62 | DEC'08 | ||||
| 34 | BLL/526 | 19-Feb-08 | AL.BRONZE COMP | NOS | 750 | 1 | 25.2.08 | 1 | N/A | N/A | L(1) | HR/43901, DT.3.3.08 | STANDMECH ENGINEERING | 1.5 | SEP'08 | |||||
| 35 | BLL/527 | 22-Feb-08 | PACKING CRATE | SETS | 25 | 1 | 26.2.08 | 2 | N/A | N/A | L(1) | HR/43894,DT.1.3.08 | HASSAN BROTHERS | 0.69 | DEC'08 | |||||
| PACKING WOOD | NOS | 150 | ||||||||||||||||||
| PR | 36 | PROJ/DVC-JH/007 | 23-Feb-08 | 33KV Single Phase, oil-filled, hermetically sealed, outdoor type, electro-magnetic Protection-cum-Metering C.T. having Ratio : 600-300-150/5-5 A as per technical specification | no. | 33 | Single(1) | 5-Mar-08 | ||||||||||||
| CNMBW | 37 | 9567/JC | 26-02-08 | DGC COPPER CONDUCTOR 6.45 + -0.05MM X 6.45 + - 0.05MM. | KG | 215 | SINGLE | 03/03/08 | 2 | 1.PARAMOUNT CONDUCTORS LTD. 2.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | PARAMOUNT CONDUCTORS LTD. | MB/11717/ER dt.06-03-08. | 105757.43 | WITHIN 15 DAYS. | ||||
| CNMBW | 38 | 9576/AS | 27-02-08 | LABOUR CHARGES FOR REPAIRING & REMICA OF OLD COMM. | NO | 4 | SINGLE | 03/03/08 | 2 | 1.THE BENGAL COMMUTATOR WORKS. 2.DOLPHIN ELECTRIC (INDIA). | NIL | L-1 | THE BENGAL COMMUTATOR WORKS. | MB/11749/ER dt.19-03-08. | 104000.00 | WITHIN 45 DAYS. | ||||
| CNMBW | 39 | 9577/JC | 27-02-08 | 100 TON HYDRALIC PULLER WITH PUMP & ACCESS 0RIES. | ST | 1 | SINGLE | 08/03/08 | ||||||||||||
| PR | 40 | PROJ/NASL/059 | 26-Feb-08 | Supply and fixing of MS gates 1.5 mtr. x 1.8 mtr. (single-leaf) made of strong MS frame work consist of angle, flat, etc., intermediate stiffners, MS square bars, MS sheet, gussets, cleats, etc. including necessary riveting, bolting, welding, locking and hanging arrangements as per enclosed drawing and as per direction of BLL Site-in-Charge | no. | 2 | Single(1) | 4-Mar-08 | ||||||||||||
| Supply and fixing of MS gate 4.8 mtr. x 1.8 mtr. (two-leaves) made of strong MS frame work consist of flat, etc., intermediate stiffners, MS square bars, gussets, cleats, etc. including necessary riveting, bolting, welding, locking and hanging arrangements as per enclosed drawing and as per direction of BLL Site-in-Charge | no. | 1 | ||||||||||||||||||
| PR | 41 | PROJ/NASL/060 | 27-Feb-08 | Excavation and back filling of soil (depth 1.2 mtr. X width 800mm) for underground cable trench including supply and filling of good quality sand (depth 300mm x width 600mm) and laying of bricks in two sides, as required(bricks will be provided by BLL) and laying of PVC warning tape, as per enlcosed drawing no. NASL/NESCL/RANCHI/E1/013. | RM | 1125 | Single(1) | 6-Mar-08 | 3 | 3 (Subodh Kumar Singh Construction, Hari Om Construction, Maabhawani Construction) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/049 Dt. 17.04.08 | Hari Om Construction | 672750 | 45 days | ||||
| Laying, testing and commissioning of 33KV, 1 Core x 800 sq.mm Power Cable including transportation, in underground trench / Road/ cable tray including supply and fixing of Aluminium bar saddle, GI nuts, bolts, washers etc. and mending good the damages as required for the following (cables will be supplied by BLL/NASL) | Mtr. | 4500 | ||||||||||||||||||
| Supply, transportation and laying of RCC Protection Slabs 2' x 4' in underground cable trench | nos. | 900 | ||||||||||||||||||
| PR | 42 | PROJ/NASL/061 | 28-Feb-08 | Transportation, Laying, testing & commissioning of the following cables including proper saddling, straightning, with cable tags, bindings over the angles in prepared cable trench, as per the direction and satisfaction of BLL Site In Charge. | Single(1) | 7-Mar-08 | 3 | 3 (Maabhawani Construction, Subodh Kumar Singh Construction, Hi-Tech Electro Mechanicals) | nil | Lowest tender(L1) | BLL/PROJ/NASL-R/ORD/059 DT. 23.06.08 | Hi-Tech Electro Mechanicals | 73550 | 45 days. | ||||||
| 3.5Cx 185 sq.mm. 1.1kV Grade Armoured Al. Cable | Mtr | 80 | ||||||||||||||||||
| 3.5Cx 70 sq.mm. 1.1kV Grade Armoured Al. Cable | Mtr | 250 | ||||||||||||||||||
| 3.5Cx 10 sq.mm. 1.1kV Grade Armoured Al. Cable | Mtr | 200 | ||||||||||||||||||
| 2Cx 6 sq.mm. 1.1kV Grade Armoured Al. Cable | Mtr | 300 | ||||||||||||||||||
| 2Cx2.5 sq.mm. 1.1kV Grade Armoured Cu. Stranded conductor cable | Mtr | 1650 | ||||||||||||||||||
| 3Cx2.5 sq.mm. 1.1kV Grade Armoured Cu. Stranded Conductor Cable | Mtr | 500 | ||||||||||||||||||
| 5Cx2.5 Sq.mm. 1.1kV Grade Armoured Cu. Stranded conductor Cable | Mtr | 1500 | ||||||||||||||||||
| 7Cx2.5 Sq.mm. 1.1kV Grade Armoured Cu. Stranded conductor Cable | Mtr | 900 | ||||||||||||||||||
| 10Cx2.5 Sq.mm. 1.1kV Grade Armoured Cu. Stranded conductor Cable | Mtr | 1000 | ||||||||||||||||||
| 12Cx2.5 Sq.mm. 1.1kV Grade Armoured Cu. Stranded conductor Cable | Mtr | 1000 | ||||||||||||||||||
| 2Cx4 Sq.mm. 1.1kV Grade Armoured Cu. Stranded conductor Cable | Mtr | 250 | ||||||||||||||||||
| 5Cx4 Sq.mm. 1.1kV Grade Armoured Cu. Stranded conductor Cable | Mtr | 950 | ||||||||||||||||||
| 43 | PROJ/NASL/062 | 28-Feb-08 | Transportation and Erection of G.I structures including proper alignment, fitting, fixing of nuts, bolts, washers, etc. as per enclosed drawing for 33KV switchyard at NASL, Hotwar, Ranchi site. | MT | 22 | Single(1) | 8-Mar-08 | |||||||||||||