| BIECCO LAWRIE
LIMITED |
| DETAILS OF
CONTRACTS CONCLUDED DURING THE MONTH OF SEPTEMBER 2011. |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Tender No. |
Item/Nature of work |
Mode of Tender Enquiry |
Date of Publication of NIT |
Type of Bidding (Single/Two Bid
System) |
Last date of receipt of tender |
Nos of tenders recd. |
Nos. and names of parties
qualified after technical evaluation |
Nos. and names of parties not
qualified after technical evaluation |
Whether contract awarded to lowest
tenderer/ evaluated L(1). |
Contract No. & Date |
Name of Contractor |
Value of Contract (Rs./lacs) |
Scheduled date of completion of
supplies. |
Actual date of start of work |
Actual date of completion |
Reasons for dealys if any |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 14255/AS |
DGC
CU WIRE DIA : 0.81MM. G2,F,21 SWG |
LIMITED |
06-08-11 |
SINGLE |
15-08-11 |
2 |
1.
BRITISH ELECTRIC MFG. CO.
2. PARAMOUNT CONDUCTORS LTD. |
NIL |
L-1 |
MB/16319/ER
DT.10-09-11 |
BRITISH
ELECTRIC MFG. CO. |
0.81 |
WITHIN
15 DAYS |
12-09-11 |
27-09-11 |
|
| 14256/AS |
BARE
COPPER CONDUCTOR (5.4 X 21.8)MM2. IS 6160 |
LIMITED |
09-08-11 |
SINGLE |
15-08-11 |
3 |
1.AGENTS
& SUPPLIERS 2.BRITISH
ELECTRIC MFG. CO.
3.SUMO METALIC PVT. LTD |
NIL |
L-1 |
MB/16317/ER
DT.10-09-11 |
BRITISH
ELECTRIC MFG. CO. |
1.68 |
WITHIN
5 WEEKS |
12-09-11 |
15-10-11 |
|
| 14261/AS |
BARE.BRIGHT.
VACCUM. ANNEALED CU. COND (1.85 X 19.85)MM2 |
LIMITED |
16-08-11 |
SINGLE |
24-08-11 |
3 |
1.BRITISH
ELECTRIC MFG. CO.
2.SHANKAR METAL PRODUCTS.
3.SUMO METALIC PVT. LTD. |
NIL |
L-1 |
MB/16316/ER
DT.10-09-11 |
SHANKAR
METAL PRODUCTS |
2.77 |
WITHIN
3 WEEKS |
12-09-11 |
01-10-11 |
|
| 14230/A |
NEW
COMMUTATOR WITH ETP COPPER. SEG: 123 |
LIMITED |
02-08-11 |
SINGLE |
10-08-11 |
2 |
1.THE
BENGAL COMMUTATOR WORKS.
2. COMMUTATPR MFG. |
NIL |
L-1 |
MB/16352/ER
DT.16-09-11. |
COMMUTATOR
MFG. |
0.74 |
WITHIN
30 DAYS |
20-09-11 |
22-10-11 |
|
| 14223/A |
LAB.
CH. FOR REMICA OF OLD COMMUTATOR 171 SEG |
LIMITED |
01-08-11 |
SINGLE |
08-08-11 |
3 |
1.THE
BENGAL COMMUTATOR WORKS.
2. COMMUTATPR MFG. 3.VISHALAXMI COMMUTATORS |
NIL |
L-1 |
MB/16351/ER
DT.16-09-11. |
VISHALAXMI
COMMUTATORS |
0.49 |
WITHIN
4 WEEKS |
19-09-11 |
15-10-11 |
|
| 14273/AS |
MFG
OF NEW COMMUTATOR AS PER SAMPLE |
LIMITED |
19-08-11 |
SINGLE |
27-08-11 |
2 |
1.
THE BENGAL COMMUTATOR WORKS.
2. COMMUTATOR MFG. |
NIL |
L-1 |
MB/16370/ER
DT.23-09-11. |
COMMUTATOR
MFG. |
0.74 |
WITHIN
30 DAYS |
20-09-11 |
22-10-11 |
|
| 14205/SP |
LAB.CH.FOR
ASSEY & DISMENTALED OF DC MOTOR |
LIMITED |
06-08-11 |
SINGLE |
13-08-11 |
3 |
1.BHARAT
MOTORS 2.THE ELECTROMECH INDUSTRIES 3.GHOSH SUPPLIERS. |
NIL |
L-1 |
MB/16372/ER
DT.26-09-11. |
THE
ELECTROMECH INDUSTRIES |
1.84 |
WITHIN
10 DAYS |
27-09-11 |
14-10-11 |
|
| 14287/AS |
EN
DGC CU WIRE 13.5 SWG. E2G2. H. |
LIMITED |
01-09-11 |
SINGLE |
09-09-11 |
3 |
1.AGENTS
& SUPPLIERS
2.BRITISH ELECTRIC MANUFACTURING CO. 3.PARAMOUNT CONDUCTORS LTD. |
NIL |
L-1 |
MB/16371/ER
DT.26-09-11. |
BRITISH
ELECTRIC MFG. CO. |
0.73 |
WITHIN
30 DAYS |
27-09-11 |
25-10-11 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PR/040/097 |
Cutting
& shifting of earth, leveling of site, construction of sewerage line
& connection of water supply line at IIC S/S as per following scope of
work |
Limited |
19-Aug-11 |
Single
(1) |
30-Aug-11 |
4 |
1)
Friends Engineering
2) Biswa-Bharati Construction 3) Falcon (India) Enterprise 4) Apex Construction |
NIL |
Lowest(L1) |
PR/040/ORD-101, dated
08/09/2011 |
Biswa-Bharati Construction |
2.55 |
30
days |
|
|
|
| |
Cutting
of existing heaped earth stacked along the boundry wall including disposal /
transportation of earth by mechanical transport including loading unloading
and stacking beyond initial lead above 0.5 Km & upto 2.0 Km. Complete as
per direction of site-in-charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Dresing
of haphazard earth spoils & debris etc. by cutting or filling average
depth of 250 mm. Including carrying by head load to a distance within a lead
of 100 m including breaking clods, dressing, leveling as required in
including hire charges of tools and plants and necessary supervision complete
as per direction of site-in-charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply
and laying of 150 mm dia. PVC pipes with necessary joints and connection to
the existing Pit of P.H.E. The scope includes excavation, preparation of bed
by proper ramming dresing with proper line & slope and back filling of
the excavated soil with proper compaction. The entire work should be
completed in all respects as per the direction of the Site-in-charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Construction
of Inspection pits of internal dimension 900 x 900 x 900 mm with 250 mm thick
brick work, plastering with N.C.F, P.C.C at bottom R.C.C slab with 500 mm
dia. C.I manhole etc. complete in all respect as per drawing No. PLN(D)/SS/69
including supply of all materials. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply
and laying of 1 inch dia. PVC pipe line from P.H.E Source to overhead Tank at
C & R building with necessary fittings, gate valve and connectors,
complete in all respect as per direction of site-in charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PR/041/098 |
Cutting
& shifting of earth, leveling of site, construction of sewerage line,
connection of water supply line and shifting of project materials at II-B S/S
as per following scope of work. |
Limited |
19-Aug-11 |
Single
(1) |
30-Aug-11 |
4 |
1)
Friends Engineering
2) Biswa-Bharati Construction 3) Falcon (India) Enterprise 4) Apex Construction |
NIL |
Lowest(L1) |
PR/041/ORD-100,
dated 08/09/2011 |
Biswa-Bharati Construction |
3.2 |
30
days |
|
|
|
| |
Cutting
of existing heaped earth stacked inside the boundry wall including
transportation of earth by mechanical / manual transport including loading
unloading and stacking beyond initial lead above 100 mt & upto 300 mt.
Complete as per direction of site-in-charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Dresing
of haphazard earth spoils & debris etc. by cutting or filling average
depth of 250 mm. Including carrying by head load to a distance within a lead
of 100 m including breaking clods, dressing, leveling as required in
including hire charges of tools and plants and necessary supervision complete
as per direction of site-in-charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Taking
out of Brick flat soling from switch yard area, lifting & transporting at
back side of C & R building and laying of bricks for storing of
electrical equipments as per direction of site-in-charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Shifting
and stacking of electrical equipments and other project materials (for CBD
site) from switch yard area to the store godown and back side of C&R
building as per direction of site-in charge. (contractors are requested to
visit site for ascertaining of actual involvement of work) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply
and laying of 150 mm dia. PVC pipes with necessary joints and connection to
the existing Pit of P.H.E. The scope includes excavation, preparation of bed
by proper ramming dresing with proper line & slope and back filling of
the excavated soil with proper compaction. The entire work should be
completed in all respects as per the direction of the Site-in-charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Construction
of Inspection pits of internal dimension 900 x 900 x 900 mm with 250 mm thick
brick work, plastering with N.C.F, P.C.C at bottom R.C.C slab with 500 mm
dia. C.I manhole etc. complete in all respect as per drawing No. PLN(D)/SS/69
including supply of all materials. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply
and laying of 1 inch dia. PVC pipe line from P.H.E Source to overhead Tank at
C & R building with necessary fittings, gate valve and connectors,
complete in all respect as per direction of site-in charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/0067/182 |
Dismantaling,
Re-Assembly. Erection. Testing and Commissioning of all the units at Tago SHP
site as per attached list. |
Limited |
16-May-11 |
Single
(1) |
31-May-11 |
3 |
Bhowal
Electricals, B.S. Enterprise, Hydel Equipment & Services |
|
L-1 |
PR/067/ORD-145,
Date - 09.09.2011 |
Hydel
Equipment & Services |
15.95 |
As
per Instruction of BLL site Incharge/ Engineer |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/0067/183 |
Loading
, Unloading, Packing of materials at Tago SHPas per following list:- |
Limited |
16-May-11 |
Single
(1) |
31-May-11 |
4 |
Bhowal
Electricals, B.S. Enterprise, Hydel Equipment & Services, Aryan
Enterprise |
|
L-1 |
PR/067/ORD-146,
Date - 09.09.2011 |
Hydel
Equipment & Services |
5.85 |
As
per Instruction of BLL site Incharge/ Engineer |
|
|
|
| |
Main
Inlet valve |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Sluice
valve |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Turbine |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Lubrication
oil system, filters |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hydraulic
OPU and all associated & auxillary accessories |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Generator
of Unit III as required. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Cable,
Electrical system & electrical s/yard items |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/AD/200 |
Draw
wire type Position Transducer (range 140mm, output signal 4-20mA) as per
attached document |
Limited |
16-Jul-11 |
Single
(1) |
23-Jul-11 |
3 |
Selec
Controls Pvt. Ltd., Motwani Engineering Co., A.B. Enterprise |
|
L-1 |
PR/ADT/ORD-144, Dt- 9.9.2011, |
Motwani
Engineering Co. |
0.86 |
6
weeks |
|
|
|
| |
KW
Transducer (3 phase, 4 wire, 415 V ac, no.(s) CTR: 600/5A, output: 4-20 mA,
range: 0-300 KW). |
|
|
|
|
|
|
|
|
PR/ADT/ORD-143,
Dt- 9.9.2011 |
A.B.
Enterprise |
0.02 |
|
|
|
|
| |
2-5A
motor over load relay; make – L&T / C&S. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PR/NTR/099 |
Fabrication and Supply of G.I Structural
Members along with Nuts, Bolts & Washers whenever required as per following |
Limited |
26-Aug-11 |
Single
(1) |
8-Sep-11 |
4 |
1)
M/s Biswa-Bharati Construction
2) M/s Holymoon & Company 3) M/s Nava Bharat Enterprise 4) M/s S.Sikdar
& Sons |
NIL |
Lowest(L1) |
PR/NTR/ORD-102,
dt. 26.09.2011 |
M/s Nava Bharat Enterprise |
2.29 |
30
days from mfg. Clearance |
|
|
|
| |
Supply
and fabricating of galvanised structural materials for IDBPS Sub-station,
complete as per approved drawings and bill of materials, for lighting cum
lightning structure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply
and fabricating of galvanised structural materials for IDBPS Sub-station
including nut, bolts, washers and other accessories complete as per approved
drawings and bill of materials, for platform of 33 KV outdoor VCB's. (10
nos.). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply
and fabricating of galvanised structural materials for IIB, IIC & IID
Sub-station including nut, bolts, washers and other accessories complete as
per approved drawings and bill of materials, for platform with asociated
ladder of 33 KV outdoor VCB's. (total 24 nos.). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply
and fabricating of 12 mm thick
galvanised top plate for lightning structure of 450 mm x 375 mm size,
complete as per approved drawings. (Approx. Weight for each plate is 13.3
Kg.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PR/M2/202 |
415/415V,
50KVA rated , connection vector group Dyn 11, dry type transformer suitable
for indoor installation. Transformer shall be natural air cooled, with EC
grade copper windings, with class 'C' insulation and housed in sheet steel
enclosure. Transformer of similar type & rating must be type tested from
NABL accredited type test laboratory. |
Limited |
17-Aug-11 |
Single
(1) |
30-Aug-11 |
3 |
Induction
Electric, Bhanuka Electricls, Automatic Electro Gear |
|
L-1 |
PR/0057/ORD-148,
DT-28/09/2011 |
Induction
Electric |
1.35 |
45
days |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PR/DRG/172 |
Reconditioning 4 Nos. Runner shaft Assembly & Generator Panel (Mechanical job) as
per following Scope of work for DIRANG MHs (4 x500 KW) in West Kameng Dist
in Arunachal Pradesh on lump sump turnkey basis. |
Limited |
18-Mar-11 |
Single
(1) |
29-Mar-11 |
3 |
1) B.S. Enterprise 2) Biswa-Engineering works 3) Esdee Electromill Pvt. Ltd |
NIL |
Lowest(L1) |
PR/0062/ORD-149,
dt.28.09.11 |
Esdee
Electromill Pvt. Ltd |
44.78 |
45-60 days |
|
|
|
| |
Packing
& Transportation to works at Kolkata |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Runner
shaft wornout portion build up by weld deposit. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Shaft
Journal portion finishing by grinding. Runner 22 Nos. bucket eroded portions
building up by compatible electrodes with compatible filler wire, and grind
to match the profile |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
measurements
of profile geometry to restore bucket profile and nose |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Dynamic
balanceing of runner on balancing machine at Works |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Journal
bearings 2 Nos. removal of old babbit metal prepare surface, cast babbit
metal by centrifugal casting process and machine to required size maintaing
oil clearance |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Thrust
Pads - Remetalling of Thrust pads by centrifugal casting and finally
machining to recommended thickness. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Packing
& Transport back to site |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Shaft
Seals renewal - 8 job |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
New
Generator control panel with 4 (four) incomers and 3 (three) Nos. outgoing
complete with Auxiliary Panel and all necessary protections, metering and indications and auto synchronizing
panel - 1lot |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ENQ/BLL/2011-2012/5 |
Trend
Micro Enterprise Security for Endpoint Standard consists of Office Scan
Standard Edition with 3 years licence. |
Limited |
08.09.2011 |
Single |
20.09.2011 |
2 |
Macaws
Infotech, Binary Solutions Pvt. Ltd. |
NIL |
L1 |
SYS/CON/2011-2012/1
Dated 26.09.2011 |
Macaws
Infotech |
0.96 |
3
Weeks from date of Order |
NIL |
NIL |
NIL |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1217 |
P.B.PIN |
LIMITED |
23-Jul-11 |
SINGLE |
30-Jul-11 |
3 |
N/A |
N/A |
L(1) |
HR/49938,
DT.22.9.11 |
INDUSTRIAL
INDUSTRIES |
0.68 |
OCT'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49937 |
STANDMECH
ENGINEERING |
0.94 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1225 |
STAMPING |
LIMITED |
9-Aug-11 |
SINGLE |
22-Aug-11 |
2 |
N/A |
N/A |
L(1) |
HR/49882,DT.6.9.11 |
KAWAN
ENGINEERING INDUSTRIES |
2.91 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49883 |
VAISHNAVI
ELECTROCORE |
2.07 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1226 |
STAMPING |
LIMITED |
9-Aug-11 |
SINGLE |
22-Aug-11 |
2 |
N/A |
N/A |
L(1) |
HR/49884,
DT.6.9.11 |
KAWAN
ENGINEERING INDUSTRIES |
1.18 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49885 |
VAISHNAVI
ELECTROCORE |
0.71 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1231 |
PACKING
CRATE |
LIMITED |
19-Aug-11 |
SINGLE |
26-Aug-11 |
2 |
N/A |
N/A |
L(1) |
HR/49890,DT.8.9.11 |
PRIYA
TRADING |
1.43 |
NOV'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1232 |
FIBRE
GLASS COMP |
LIMITED |
25-Aug-11 |
SINGLE |
3-Sep-11 |
2 |
N/A |
N/A |
L(1) |
HR/49953,
DT.23.9.11 |
SANTI
FIBRE INDUSTRIES (INDIA ) |
8.91 |
SEP'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1233 |
FASTENERS |
LIMITED |
1-Sep-11 |
SINGLE |
7-Sep-11 |
4 |
N/A |
N/A |
L(1) |
HR/49926,
DT.17.9.11 |
B.B.GHOSH&CO. |
0.15 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49927 |
DE
ENGINEERS |
0.33 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49928 |
SANJOY
HARDWARE AGENCY |
0.63 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49929 |
WESTERN
TRADING CORPORATION |
0.01 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1234 |
SPRING |
LIMITED |
8-Sep-11 |
SINGLE |
15-Sep-11 |
4 |
N/A |
N/A |
L(1) |
HR/49954,
DT.26.0.11 |
DEVI
METAL INDUSTRIS |
0.86 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49956 |
FREE
INDIA SPRINGS |
0.07 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49955 |
RAMKRISHNA
SPRING COMPANY |
0.85 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49957 |
SHIVA
DURGA SPRING CO. |
0.49 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1235 |
COIL
ON BOBBIN |
LIMITED |
9-Sep-11 |
SINGLE |
15-Sep-11 |
3 |
N/A |
N/A |
L(1) |
HR/49959,
DT.26.9.11 |
HYECO
SYSTEMS AND DEVICES |
1.54 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49961 |
K.S.ENTERPRISE |
0.91 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49960 |
R.D.ELECTRIC
WORKS |
1.41 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1236 |
COIL
ON BOBBIN |
LIMITED |
9-Sep-11 |
SINGLE |
15-Sep-11 |
3 |
N/A |
N/A |
L(1) |
HR/49950,
DT.23.9.11 |
HYECO
SYSTEMS AND DEVICES |
0.75 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49951 |
K.S.ENTERPRISE |
0.76 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49952 |
R.D.ELECTRIC
WORKS |
1.76 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1237 |
FRP
OPERATING LINK |
LIMITED |
14-Sep-11 |
SINGLE |
21-Sep-11 |
2 |
N/A |
N/A |
L(1) |
HR/49965,
DT.27.9.11 |
MODOPLAST
CO. |
0.72 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49966 |
SANTI
FIBRE INDUSTRIES (INDIA ) |
0.53 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1238 |
TOOLS |
LIMITED |
14-Sep-11 |
SINGLE |
21-Sep-11 |
3 |
N/A |
N/A |
L(1) |
HR/49969,
DT.27.9.11 |
CALCUTTA
MARKETING |
0.13 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49970 |
KRISHNA
SUPPLY AGENCY |
0.01 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49971 |
KRISHNA
STORES AGENCY |
0.06 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/1239 |
TOOLS |
LIMITED |
15-Sep-11 |
SINGLE |
21-Sep-11 |
3 |
N/A |
N/A |
L(1) |
HR/49963,DT.27.9.11 |
CALCUTTA
MARKETING |
0.12 |
DEC'11 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/49964 |
KRISHNA
STORES AGENCY |
0.28 |
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|