| BIECCO LAWRIE
LIMITED |
|
| DETAILS OF
CONTRACTS CONCLUDED DURING THE MONTH OF MARCH '2007.(VALUE > Rs.50,000/-) |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Tender No. |
Item/Nature of work |
Mode of Tender Enquiry |
Date of Publication of NIT |
Type of Bidding (Single/Two Bid
System) |
Last date of receipt of tender |
Nos of tenders recd. |
Nos. and names of parties
qualified after technical evaluation. |
Nos. and names of parties not
qualified after technical evaluation. |
Whether contract awarded to lowest
tenderer/ evaluated L(1). |
Contract No. & Date |
Name of Contractor |
Value of Contract (Rs.lacs) |
Scheduled date of completion of
supplies. |
Actual date of start of work |
Actual date of completion |
Reasons for dealys if any |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/282 |
CA/CRCA SHEETS |
LIMITED |
1-Feb-07 |
single |
10-Feb-07 |
2 |
N/A |
N/A |
L(1) |
HR/42201, DT.28.03.07 |
S.K.INDUSTRIAL CORPORATION |
14.27 |
MAY'07 |
|
|
|
| BLL/286 |
M/C. COMPONENTS(BRASS BASE ITEMS |
LIMITED |
5-Mar-07 |
SINGLE |
15-Mar-07 |
2 |
N/A |
N/A |
L(1) |
HR/42179, DT.22.3.07 |
STANDMECH ENGINEERING |
2.10 |
SEP'07 |
|
Continuous |
|
| |
|
|
|
|
|
|
|
|
|
HR/42180, DT.22.3.07 |
U.B.INDUSTRIES |
0.70 |
SEP'07 |
|
Continuous |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/287 |
COIL |
LIMITED |
7-Mar-07 |
SINGLE |
13-Mar-07 |
3 |
N/A |
N/A |
L(1) |
HR/42169, DT.19.3.07 |
K.S.ENTERPRISE |
0.28 |
APR'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/42168, DT.19.3.07 |
R.D.ELECTRIC WORKS |
0.42 |
APR'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| AD/ENQ/0274 |
Development & Maintenance of
Garden at SGW |
Limited Tender |
19.02.07 |
Single |
26.02.07 |
3 |
1) KALPANA NURSERY 2) MODERN
GARDEN 3) THE MANJILA NURSERY |
|
L1 |
AD/HR/1952/SER DT. 05.03.2007 |
M/S KALPANA NURSERY |
0.60 |
29.02.08 |
01.03.07 |
YEARLY |
|
| AD/ENQ/0273 |
Swabing of shop floor at SGW |
Limited Tender |
19.02.07 |
Single |
26.02.07 |
2 |
1) LEE CONSTRUCTION 2) ROYAL
SERVICING ENTERPRISE |
|
L1 |
AD/HR/1963/SER DT.30.03.07 |
M/S LEE CONSTRUCTION |
0.98 |
31.03.09 |
01.04.07 |
2 YEARS |
|
| AD/ENQ/0266 |
Summer Uniform for 2007 |
Limited Tender |
10.02.07 |
Single |
24.02.07 |
3 |
1) SUMAN DRESSES, 2) BAPI TAILORS
& 3) DRESS LAND TAILORS |
|
L1 |
AD/HR/1966/WLF DT. 30.03.2007 |
M/S SUMAN DRESSES |
1.97 |
30.04.07 |
01.04.07 |
30.04.07 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/016 |
Labour Charges for Earth work in
excavation in fdn. Trenches, drains etc. (not exceeding 2 m in width or 10
sqm on plan ) including dressing of sides & ramming of bottoms, lift upto
1.5 m, including getting out the excavated soil & disposal of surplus
excavated soils as directed within a
lead of 50 m complete as per specifications, drawing & instruction of
Engineer-in -Charge : |
Limited |
27-Oct-06 |
Single |
6-Nov-06 |
3 |
3 (Jai Construction, Rajendra
Prasad Mandal, Chhotanagpur Builders) |
Nil |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/019 Dt.
07.03.07 |
Jai Construction |
13.64 |
90 days |
12-Mar-07 |
|
|
| |
All kinds of soil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Ordinary rock |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hard rock ( requiring blasting) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hard rock ( blasting prohibited
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Extra over item (4) above for excavation in all kinds of
soil & rock : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
For
each additional lift of 1.5 m or part thereof over the initial lift |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
For each additional lead of 50 m
or part thereof beyond the initial lead of 50 m, but upto a maximum of 100.0
m in total (i.e. max. 2 leads) beyond the initial lead. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for Earthwork in
filling in trenches, plinth & sides of foundation etc. in layers not
exceeding 200 mm in depth, consolidating & dressing each deposited layer
by ramming & watering, lead upto 50 m & lift upto 1.5m including cost
of carriage of materials etc. complete as per drgs., specifications &
directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
with approved quality sand |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
with excavated earth ( excluding
rock ) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
with borrowed earth within a
lead of 200m. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying in position plain cement
concrete with coarse sand & well graded, washed & screened stone
aggregates of approved quality and size 20 mm & down including mixing,
vibrating, curing etc. complete but excluding centering & shuttering as
per drawings, specification & direction in foundation & plinth. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Mix 1 : 3 : 6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying in position Reinforced
Cement concrete work with coarse sand & 20 mm. & down stone
aggregates of approved quality, well
graded, washed and screened including cost of transport of all materials to
site., mixing, laying, vibrating, curing etc. complete but excluding the cost
of reinforcement and formwork as per drgs., specifications & directions
in foundation, beam & Column with
: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Concrete mix 1: 2 : 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for Laying,
straightening, cutting, bending, cranking, hooking, fixing, binding &
placing at any position in superstructure, fdn., & plinth with MS /
Torsteel reinforcements in all works of concrete, masonry etc, including
supply of binding wire with 18 SWG (1.05mm) galvanised wire twisted tight and
/ or welding the splices where necessary as per IS codes or direction and
holding in position with steel rod spacer / chairs / horses etc. complete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Charges for Brickwork in
superstructure with Bricks of Class designation 50 & cement mortar with
coarse sand as specified below
including supply & carriage of all materials to site, scaffolding
& curing complete as per drg., specifications and directions : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
With 1: 6 cement mortar |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Charges & Hiring Charges for erecting, centering, supporting, striking, cleaning etc.
of formwork of approved design with staging, props and supports for plain & RCC works with all
accessories and at all heights including removal of forms as per drawings,
specifications & directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Charges for Cement
plaster to walls & R.C.C. structures including all necessary scaffolding,
curing, rounding off, chamfering etc. complete at all heights as per drg,
spec. & directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
12 mm th. cement plaster |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
i) With mix 1:6 ( 1 Cement
: 6 Coarse sand ) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Prepare surface &
Applying Two or more coats of cement
colour on new work such as SNOWCEM –
Plus/ DUROCEM EXTRA of approved colour & shade on exterior faces of
walls, columns, beams etc. at all heights including the rough cleaning &
smoothening of surface, cost of all materials, curing, scaffolding etc.
complete |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Prepare the surface &
Applying painting (two or more coats)
synthetic enamel paint of approved quality and shade ( J&N, Berger, Asian Paints) on
new work over and including a coat of ready mixed red oxide zinc chromate primer of approved brand &
manufacturer in steel work including cost of all materials, scaffolding etc.
complete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Prepare the surface &
painting (two or more coats) Aluminium paint of approved quality and shade (
J&N, Berger, Asian Paints) on new work over and including a coat of ready
mixed Aluminium primer of approved brand & manufacturer in steel work
including cost of all materials, scaffolding etc. complete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fitting & fixing G-I barbed
wire conforming to IS: 278 - Type I, 4 barbs 75 mm. spacing to RCC posts or
MS angle bend posts on a boundary wall with fixing arrangements already
provided with the posts complete. (Supplying and fixing of post is to be paid
separately & payment is to be
made on the basis of the length per line of
barbed wire fixed.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Transporting, assembling,
erecting,fabricating, fitting & fixing in position of MS angle post &
struts for fixing chain-link fencing, barbed wire over boundary wall, cable
trays and racks, all embedded steelwork such as foundation materials, inserts,
clamps, stops, bolts, fan hooks etc. in concrete & masonry works, and
miscellaneous structures etc. complete
with a coat of primer complete as per drgs., specifications &
directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/WBSEB-BNDC/R/ABS/06-07 |
11 KV, 400A, 3-ph, Gang operated
AB switch along with support insulators operating mechanism, Base Channel
down pipe, terminal connectors and other accessories complete as per TS. |
Limited |
13-Dec-06 |
Single |
20-Dec-06 |
4 |
4 (P. R. ENGINEERING WORKS, BHARAT
ELECTRICAL INDUSTRIES, ALLIANCE ENGINEERS PVT. LTD., PROJECT ELECTRICAL
INDUSTRIES (INDIA) PVT. LTD.)
|
Nil |
Lowest tender (L1) |
BLL/PROJ/WBSEB-R/071/AMD Dt.
17.03.07 |
Project Electrical Industries
(India) Pvtl Ltd. |
0.53 |
30 days |
2-Mar-07 |
Not completed |
Drawing amendment by WBSEB. |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/WBSEB-BNDC/R/MISC-W/06-07 |
Labour Work :- |
Limited |
2-Mar-07 |
Single |
8-Mar-07 |
3 |
3(D.D. Engineering Co., A K
Enterprise, FRD Construction) |
NIL |
Lowest tendeer(L1) |
BLL/PROJ/WBSEB-R/072 Dt. 12.03.07 |
FRD Construction |
1.44 |
Supply - 15 days & Erection -
21 days |
12-Mar-07 |
Completed |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Contract for construction
of Plinth Protection at Control Room Building at WBSEB Rajarhat site. The
scope of work are as under :- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for Single brick
flat soling of pick jhama bricks including ramming, dressing the bed to
proper level and filling the joints with locally available sand - area approx
180 Sq.Mtrs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for 50 mm.thick
PCC 1:2:4 M-15 Cement concrete with graded stone chips (6mm size) mix
including neat cement punning at the top - area approx 180 Sq.Mtrs |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Contract for construction
of Plinth Protection at Security Room Building at WBSEB Rajarhat site - The
scope of work are as per sl no. 1 above |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Contract for Roof Treatment work at Security room
building - Area Approx 100 sq.ft |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Contract for Shfiting of following materials from
existing store to new store - apprx distance 100 Mtrs. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
ACSR Drum- 24 nos. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
33 KV XLPE Cable drum
- 1 Nos. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
V Bracket & Top Adoptor -
Approx. weight - 6 MT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
TOR Steel, MS Steel - Approx. weight - 25 MT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Earth Spike, Stay Set, Insulator, Oil drum, Hume Pipe, Guy
Insulator, stay wire, GI Wire, Earth plate etc. - Approx. weight - 30 MT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Contract for Site surfacing & Levelling by
providing labour including all tools, tackles etc, as per direction of site
in charge |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Contract for Preparation of a new stores at WBSEB
Rajarhat Site ( approx area 4000 sq.ft.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Contract for cleaning of WBSEB Rajarhat Site by providing labour, tools & tackles
etc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply Work |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of GI Barbed wire |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of bamboo, GI corrogated sheet, Asbestor sheet, wire,
Steel, window, door etc for Preparation of 4000 sq.ft area of new stores at
WBSEB Rajarhat site |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/WBSEB-BNDC/R/LND-1/06-07 |
Supplying and delivery of good quality earth (soil) at WBSEB,
Rajarhat substation site |
Limited |
5-Mar-07 |
Single |
12-Mar-07 |
3 |
3(Tarama Enterprise, Maya
Enterprise, Annapurna Enterprise) |
Nil |
Lowest tender(L1) |
BLL/PROJ/WBSEB-R/073 Dt. 13.03.07 |
Annapurna Enterprise |
2.41 |
10 days, staggered delivery as per
requirement at site. |
13-Mar-07 |
Completed |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/WBSEB-BNDC/R/MISC-S/06-07 |
Supply of Rubber Mat 2.5mm thick
and 2 mtr. long and 1 mtr. wide. ISI mark embossed on it. |
Limited |
5-Mar-07 |
Single |
12-Mar-07 |
4 |
4(Apex Construction, S Sikdar
& Sons, A K Enterprise, Neptune Enterprise) |
Nil |
Lowest tender(L1) |
BLL/PROJ/WBSEB-R/074 Dt. 15.03.07 |
A K Enterprise |
1.07 |
15 days |
15-Mar-07 |
Completed |
|
| |
Supply of Chaker Plate, 5mm
thick and hinge fixed on both side which are to be placed on cable trench
beside panels, length & breadth to be mentioned by BLL Site-In-charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of Flood Light Luminaires
400W equivalent to phillips Cat Ref : MNF 14/400 complete with all,
accessories and control gear box
(Including Lamp ) - HPIT - 400 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of flex light banner of
design approved as per BLL Site-In-Charge of 13' long and 5' height fixed
with all fittings and fixtures. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of flex non light banner
design as approved by BLL Site-In-Charge, of 13' length and 5' height fixed
with all fitting and fixtures. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/020 |
Providing services of obtaining
Contractor's License of Jharkhand from Directorate of Electricity, Govt. of
Jharkhand, Ranchi with license validity for one year including the following
:- |
Limited |
9-Mar-07 |
Single |
15-Mar-07 |
3 |
3 (Vidyut Kendra, Concept
Engineering, Arun Electricals) |
NIL |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/020 Dt.
19.03.07 |
Concept Engineering |
0.65 |
30 days and as per the instruction
of Site-In-Charge |
19-Mar-07 |
|
|
| |
Engaging Lineman (with wireman
license of Jharkhand) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Engaging Electrical Supervisor
with S.C.C. of Jharkhand. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Incidental and statutory
expenses for license. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/WBSEB-BNDC/MSC-C/06-07 |
Providing & supplying
construction materials like steel, cement etc. for security fencing and
culvert at switch yard. |
Limited |
10-Mar-07 |
Single |
16-Mar-07 |
4 |
4 (Apex Construction, D. D.
Engineering Co., Friends Construction, DEECON) |
Nil |
Lowest tender(L1) |
BLL/PROJ/WBSEB-R/075 Dt. 22.03.07 |
Apex Construction |
1.71 |
30 days |
22-Mar-07 |
|
|
| |
Providing & supply of
straining bolt for 250mm long for stressing of barbed wire |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and supplying 3.0 mm
thick MS Sheet, MS roller and MS Guide channel of 40mm x 6mm MS Flat for main
gate. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and erection of
precast cover slab for mechanism box and cable loop with lifting arrangement
(30 nos.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and erection of cable
trenches for 185 sq.mm outgoing cable and way to mechanism box from main
trench. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and construction of
cable loop as per drawing and specification. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and construction of steps and ramp at out
side of control room building including demolition the existing structure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and erection of
concrete platform below gate (4000x2400) at switchyard fencing including cast
of steel, cement , stone chips, sand etc. complete (58 nos.). |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing, mending good and
finishing top surfaces sides of precast coverslab at control room building
including cost of all men and materials complete (58 nos.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing & erection with
plaster and a floating coat of cement finish to foundation structures of Rail
Pole & PSCC Poles as per direction of BLL Site-In-Charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and placing M-15
cement concrete to switchyard portion at different places including cost and
carriage of all men and materials. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Erection of fire extinguisher
equipments with all necessary accessories to wall of control room and mending
good all damages. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for cleaning,
washing gravels, stocked at site and spreading at switchyard upto a depth of
100mm. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hire and labour charges for
re-alignment of cable trenches by taking out coverslab, MS angles and
refixing the same true to line and level including cost of all labour machine
complete as per direction of BLL Site-In-Charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for filling of
earth, compacting and dressing around security room as per direction of BLL
Site-In-Charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and fitting, fixing
different works at site :- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Marble |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Walkway to Inauguration platform |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Cover slab for sump pit |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Ramp to concrete platform |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for levelling
dressing switchyard |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for shifting
godown by dismantling the same, construction a new godown as directed. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for dismantling
of existing, stockyard, kitchen, office room, bathroom and stacking the
servicable materials at site as per direction of BLL Site-In-Charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and construction of
new cable trenches from cable loop as per direction including cost of all
labour and materials. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for construction
of temporary office room and pantry room |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supplying and fixing darma mat
lining to office room. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for cleaning of
drain, approach road, bathroom etc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and fixing of flex
banner including construction of 3 nos. pillar, MS angle and painting
complete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Providing and applying synthetic
enamel paint to gate, skirting and window grill of office space, distemper
paint to walls and ceiling as per direction of BLL Site-In-Charge. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/WBSEB-BNDC/R/MISC/06-07 |
Supply and fixing of 4mmcopper
Rod 6"-0" long necessary arrangement for Battery charging. |
Limited |
1-Mar-07 |
Single |
7-Mar-07 |
4 |
4(Power Track, Sri Bisnu
Construction Company, Mukti Traders, J S Construction) |
Nil |
Lowest tender(L1) |
BLL/PROJ/WBSEB-R/076 Dt. 22.03.07 |
Sri Bisnu Construction Company |
2.52 |
Supply within 15 days &
Erection within 21 days from order. |
22-Mar-07 |
|
|
| |
Supply, fabrication and fixing
of Copper 50 x 6 mm Flat for cable Termination with C.T. at 11 KV V.C.B. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of Brick and protection
cover with Brick 60 nos.per mtr and supply and filling of sand in
excavated cable Trench. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply and fixing of 2.5 mts
long 100mm dia G.I.Pipe for 11KV Cable Protection at cable Terminal end for
10 pole structure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of Junction Box with
fixing of Plinth Base channel for 33KV CT & PT |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply and fixing of best
quality of Terminal Block with necessaryconnection at Junction Box for 33KV
CT, PT & Outdoor VCB |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of 33KV Post Insulator
for Jumpering arrangement of Power Transformer to 300 sq.mm Cable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supplyof 25 x 3mm - G.I.Flat for
11KV Pannel, A/C Paneel, D.C.Pannel, Battery charger etc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of Terminal Box for yard
lighting and control room with necessaryTerminal connector &
fuses(cut-out) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply and fixing of
24"x30" Junction Box with necessary Bus bar Terminal connector,
fuse & socket |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of Gland Socket &
P.V.C. Type for Termination of cable end :- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm - 4 core
(Double Compression - 36, Single Compression-50) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm - 7 core (Double Compression-14/Single Compression -1) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm -9 core (Single Compression) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
16 sq.mm -4 core (Single Compression) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
120 sq.mm - 3-1/2 core (Single Compression) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of 11KV 45 KN Disc
Insulator |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Installation of 11KV V.C.B. 7
Pannel(I/C-2 Nos., Bus Cuppler-1No., O/G - 4 nos.) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Placing of Station service
Transformer on accurate alignment on existing plinth. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying of control cable in
cable trench: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm- 4 core |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm -7 core |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm -9 core/10 core |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying of 120sq.mm, 3-1/2 core
PVC Cable from station service Transformer to A.C.Pannel. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying of 300 sq.mm 3core, 11 KV
XLPE Cable from 6.3 MVA Power Transformer to 11KV V.C.B. at existing cable
Trench for incoming. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Excavating of earth for laying
of 11KV 185sq.mm for 4 Nos. out-going (Cable Trench size 1.0 mtr deep and 1.3
mtr wide) Run & Re-instaterment of cable Trench by excavated soil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Making of straight through
jointing Pit (11KV) with brick protection & filling of sand after cutting
of straight through jointing Pit. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Raising and fixing of XLPE cable
upto 3 mtr along D.P. structure end and 11KV Pannel end with making necessary
clamp, Nut&Bolt & cable socket, etc. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Making of Terminal Jointing
arrangement of 300/185 sq.mm 3core 11KV XLPE Cable of both side :- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Indoor Joint 300sq.mm XLPE Cable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Outdoor Joint for 300 sq. XLPE
cable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Indoor joint 185sq.mm XLPE cable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Out-door Joint 300sq.mm XLPE
Cable |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Raising and fixing of XLPE Cable
at Cable Terminal Structure with making of necessary clump, Nut & Bolts
and supply of socket. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying of 16sq.mm, 3-1/2 core
PVC cable for yard lighting & control room lighting. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Excavation of earth 0.6 mtr deep
& 0.5 mtr wide for making cable Trench & Re-instatement of cable
trench by excavated soil. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fabrication and fixing of light
fittings structure at Rail Pole and control room Building. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fixing of Sodium Vapour
H.P.Light fittings with necessary connection. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fixing of 33 KV Post Insulator
(2Nos. set) for 11KV Jumpering arrangement from 6.3 MVA Power Transformer to
300 sq.mm cable end |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying & connection of 25 x
3mm G.I.Flat for earthing arrangement from A.C., D.C.Pannel battery charger. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Making
& fixing of Earth Bus at Wall for VHF set and earth connection by 25 x 3
G.I. Flat from 50 x 6 G.I.Earth Bus at Control room cable trench. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fixing of Terminal Box with
necessary terminal connector, fuse, socket, clamp and Nuts & Bolts for
yard lighting. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fixing of Gland and Socket for
Termination of cable end with necessary arrangement:- |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm 4 core |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm 7 core |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
2.5 sq.mm 9 core |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
16
sq.mm 4 core |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
120 sq.mm 3-1/2 core |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Sand filling in pre-constructed
concrete cable Trench. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Jumpering arrangement of both
side of 33 KV V.C.B. from 33KV C.R. type Isolator for 33 KV C.T. by A.C.S.R.
Dog Conductors. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Jumpering
arrangement of 6.3 MVA Power Transformer to 11 KV Cable end by A.C.S.R. Dog
& connectors. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Jumpering arrangement of 33 KV
fuse D.P. to 6.3MVA Power Transformer by A.C.S.R. Dog Conductor and
connectors. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying of 185 sq.mm 3 core XLPE
11KV cable in Trench. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Schedule of works for erection
of 10 pole (9mtr.long PCC Pole)
Structure with drawal of 11KV Common Bus bar & fixing of 11 KV
Isolator |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Erection
of P.S. C.C. 9 mtr long pole for 11KV Common Bus structures at the
sub-station yard including Civil foundation of P.S.C.C.Pole by P.C.C. of
1:2:4. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Making fabrication of channel
Angle & clamp and fixing of 10 Pole compound structure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fixing of 11 KV T.P.G.O.
Isolator. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Supply of red oxide and
Aluminium paint of approved quality and painting of red oxide one coat and
aluminium 2 coats of 10 Pole compound structure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fixing of 11 KV Disc Insulator
with Hardwire fittings. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Fixing of 11KV Pin Insulator
with G.I. Pin 11 KV. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Drawal of H.L. & L.L. 11KV
Bus necessary Jumpering arrangement and dropper arrangement of H.L. Bus to
L.L Bus. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Earthing of 10 Pole Structure. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ENQ/BLL/2006-07/12 |
600 VA UPS |
Limited |
19.02.2007 |
Single |
27.02.2007 |
4 |
G.P.Tronics Pvt. Ltd., Myrinda
Systems, ARC Infotech Pvt. Ltd., OPTO Audio Electronic Product Pvt. Ltd. |
NIL |
L(1) |
ITE011/NIH/39 date- 05.03.2007 |
G.P.Tronics Pvt. Ltd. |
1.17 |
Within 2 weeks |
|
11.03.07 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8769/AS |
KAPTON
COVER CONDUCTOR |
LIMITED |
19/3/2007 |
SINGLE |
26/3/2007 |
1 |
PEARL
INS. PVT LTD. |
NIL |
L1 |
10900 28/3/2007 |
PEARL
INSULATION (P) LTD. |
3.11 |
20
DAYS |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8672/AS |
NEW
COMMUTATOR |
LIMITED |
8/2/07 |
SINGLE |
15/2/07 |
3 |
THE
BENGALCOMMUTATOR,COMMUTATOR MFG, DOLPHIN ELECTRIC |
NIL |
L1 |
10892 24/3/2007 |
THE
BENGAL COMMUTATOR |
1.46 |
30
DAYS. |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8653/AS |
NEW
COMMUTATOR |
LIMITED |
3/2/07 |
SINGLE |
10/2/07 |
2 |
THE BENGALCOMMUTATOR,
COMMUTATOR MFG, |
NIL |
L1 |
10891 24/3/2007 |
THE
BENGAL COMMUTATOR |
1.35 |
30
DAYS |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8714/AS |
NEW
SILVER BEARING COMMUTATOR |
LIMITED |
21/2/2007 |
SINGLE |
28/2/2007 |
2 |
DOLPHIN
ELECTRIC,
THE BENGAL COMMUTATOR |
NIL |
L1 |
10876 19/3/07 |
DOLPHIN
ELECTRIC(I) |
1.92 |
30 DAYS |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
, |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8705/AS |
REPLACEMENT OF RISER
& REMICA OF COMMUTATOR |
LIMITED |
19/2/2007 |
SINGLE |
26/2/2007 |
2 |
DOLPHIN
ELECTRIC,
THE BENGAL COMMUTATOR |
NIL |
L1 |
10875 19/3/07 |
THE
BENGAL COMMUTATOR |
1.99 |
45
DAYS |
|
N/A |
|
| |
|
|
|
|
|
|
INSUL. (P) LTD. |
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8708/AS |
EN.
DGC COPPER CONDUCTOR |
LIMITED |
19/2/2007 |
SINGLE |
24/2/2007 |
2 |
SWARNAGIRI
WIRE PARAMOUNT CONDUCTOR |
NIL |
L1 |
10858 13/3/07 |
SWARNAGIRI
WIRE INS. P.LTD |
0.79 |
21
DAYS |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
, |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8706/AS |
EN.
DGC COPPER CONDUCTOR |
LIMITED |
19/2/2007 |
SINGLE |
24/2/2007 |
1 |
SWARNAGIRI
WIRE INS. P.LTD |
NIL |
L1 |
10857 13/3/07 |
SWARNAGIRI
WIRE INS. P.LTD |
1.04 |
21 DAYS |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
, |
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8711/AS |
EN.
DGC COPPER CONDUCTOR |
LIMITED
|
21/2/2007 |
SINGLE |
27/2/2007 |
2 |
SWARNAGIRI
WIRE PARAMOUNT CONDUCTOR |
NIL |
L1 |
10856 13/3/07 |
SWARNAGIRI
WIRE INS. P.LTD |
1.19 |
21 DAYS. |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8673/AS |
ATCC
CABLE |
LIMITED
|
8/2/07 |
SINGLE |
15/2/07 |
4 |
BHATTER
ELECTRICAL AND ELECTRONICS,MACHINERY SPARE PARTS,NISHANT MARKETING,SINHA
INSULATED CABLE P LTD. |
NIL |
L1 |
10842 2/3/2007 |
BHATTER ELECTRICALS & ELECTRONICS |
1.2 |
45 DAYS |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8696A/SP |
ROTOR
CU BAR,ELECTROLYTEHARD DRAWN CU |
LIMITED
|
19/2/2007 |
SINGLE |
26/2/2007 |
2 |
MA-KALI
ENGG. WORKS., J.S INDUSTRIES |
NIL |
L1 |
10840
1/3/2007 |
MA-KALI
ENGG. WORKS. |
0.87 |
21 DAYS |
|
N/A |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8734/AS |
NOMEX
PAPER |
LIMITED |
8/3/07 |
SINGLE |
14/3/2007 |
3 |
COMMERCIAL
SUPPLY SYNDICATE, HATIM DIELECTRIC P.LTD. M.S INDUSTRIES |
NIL |
L1 |
10903 30/3/2007 |
COMMERCIL
SUPPLY SYNDICATE |
0.56 |
10KG.
IN 6/07& BAL. WITHIN 08/07 |
|
N/A |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|