|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BIECCO LAWRIE
LIMITED |
|
| DETAILS OF
CONTRACTS CONCLUDED DURING THE MONTH OF JUNE '2007.(VALUE > Rs.50,000/-) |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Tender No. |
Item/Nature of work |
Mode of Tender Enquiry |
Date of Publication of NIT |
Type of Bidding (Single/Two Bid
System) |
Last date of receipt of tender |
Nos of tenders recd. |
Nos. and names of parties
qualified after technical evaluation. |
Nos. and names of parties not
qualified after technical evaluation. |
Whether contract awarded to lowest
tenderer/ evaluated L(1). |
Contract No. & Date |
Name of Contractor |
Value of Contract (Rs.lacs) |
Scheduled date of completion of
supplies. |
Actual date of start of work |
Actual date of completion |
Reasons for dealys if any |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/024 |
Labour Charges for Earth work in
excavation in fdn. Trenches, drains etc. (not exceeding 2 m in width or 10
sqm on plan ) including dressing of sides & ramming of bottoms, lift upto
1.5 m, including getting out the excavated soil & disposal of surplus
excavated soils as directed within a
lead of 50 m complete as per specifications, drawing & instruction of
Engineer-in -Charge : |
Limited |
12-May-07 |
Single |
22-May-07 |
3 |
3 (Sanjay Kumar Sharma, Arvind
Kumar Sinha, M.P. Enterprises) |
NIL |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/026 Dt.
06.06.07 |
Sanjay Kumar Sharma |
252420 |
60 days from order |
6-Jun-07 |
|
|
| |
All kinds of soil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Ordinary rock |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hard rock ( requiring blasting) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hard rock ( blasting prohibited
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Extra over item (1) above for excavation in all kinds of
soil & rock : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
For
each additional lift of 1.5 m or part thereof over the initial lift |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
For each additional lead of 50 m
or part thereof beyond the initial lead of 50 m, but upto a maximum of 100.0
m in total (i.e. max. 2 leads) beyond the initial lead. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for Earthwork in
filling in trenches, plinth & sides of foundation etc. in layers not
exceeding 200 mm in depth, consolidating & dressing each deposited layer
by ramming & watering, lead upto 50 m & lift upto 1.5m including cost
of carriage of materials etc. complete as per drgs., specifications &
directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
with excavated earth ( excluding
rock ) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying in position plain cement
concrete with coarse sand & well graded, washed & screened stone
aggregates of approved quality and size 20 mm & down including mixing,
vibrating, curing etc. complete but excluding centering & shuttering as
per drawings, specification & direction in foundation & plinth. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Mix 1 : 3 : 6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying in position Reinforced
Cement concrete work with coarse sand & 20 mm. & down stone
aggregates of approved quality, well
graded, washed and screened including cost of transport of all materials to
site., mixing, laying, vibrating, curing etc. complete but excluding the cost
of reinforcement and formwork as per drgs., specifications & directions
in foundation, beam & Column with
: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Concrete mix 1: 2 : 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for Laying,
straightening, cutting, bending, cranking, hooking, fixing, binding &
placing at any position in superstructure, fdn., & plinth with MS /
Torsteel reinforcements in all works of concrete, masonry etc, including
supply of binding wire with 18 SWG (1.05mm) galvanised wire twisted tight and
/ or welding the splices where necessary as per IS codes or direction and
holding in position with steel rod spacer / chairs / horses etc. complete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Charges & Hiring Charges for erecting, centering, supporting, striking, cleaning etc.
of formwork of approved design with staging, props and supports for plain & RCC works with all
accessories and at all heights including removal of forms as per drawings,
specifications & directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Charges for Cement
plaster to walls & R.C.C. structures including all necessary scaffolding,
curing, rounding off, chamfering etc. complete at all heights as per drg,
spec. & directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
12 mm th. cement plaster |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
With mix 1:6 ( 1 Cement : 6 Coarse sand ) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/028 |
Bricks (2nd Class) |
Limited |
23-May-07 |
Single |
1-Jun-07 |
3 |
3 (Shiv Shakti Enterprises, Jai
Matadi Stone Chips Crusher, Jitendra Kr. Rawani) |
NIL |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/027 Dt.
06.06.07 |
Jitendra Kr. Rawani |
474300 |
2 days from order. Delivery will
be staggered depending on Site requirement. |
6-Jun-07 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/026 |
Stone Chips (3/4" Pure -
Black) |
Limited |
18-May-07 |
Single |
28-May-07 |
4 |
4 (Shree Durga Stone Industries,
Balajee Enterprises, Shree Krishna Enterprises, Maa Kali Enterprises) |
Nil |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/028 Dt.
18.06.07 |
Shree Durga Stone Industries |
182560 |
2 days from order and staggered
delivery as per site requirement |
20-Jun-07 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/027 |
Sand (Medium Course) |
Limited |
18-May-07 |
Single |
28-May-07 |
3 |
3 (Shiv Shakti Enterprises, Jai
Matadi Stone Chips Crusher, Jai Maa Kali Enterprises) |
Nil |
Lowest tender(L1) |
| BLL/PROJ/DVC-BIADA/ORD/029
Dt. 25.06.07 |
|
Jai Matadi Stone Chips Crusher |
49432 |
within 2 days of placement of
order. Staggered delivery as per site requirement. |
28-Jun-07 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/025 |
Labour Charges for Earth work in
excavation in Switchyard ground including dressing of sides & ramming of
bottoms, lift upto desired level, including getting out the excavated soil
& disposal of surplus excavated soils as directed within the premises of the compound of the
substation complete as per specifications, drawing & instruction of
Engineer-in -Charge : |
Limited |
12-May-07 |
Single |
22-May-07 |
3 |
3 (Sanjay Kr. Sharma, Jay Bharat
Construction, Jai Matadi Stone Chips Crusher) |
Nil |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/030 Dt.
25.06.07 |
Jai Matadi Stonechips Crusher |
1598575 |
15 days from order. |
28-Jun-07 |
|
|
| |
All kinds of soil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Ordinary rock |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hard rock ( requiring blasting) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hard rock ( blasting prohibited
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Compaction of earth work by
rolling with power roller of suitable capacity including watering etc. for
banking excavated earth in layers not exceeding 20 cm. In depth. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
only the top-most layer |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Rolling each layer after banking
excavated earth in layers not exceeding 20cm in depth |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Dressing, watering & ramming
in layers not exceeding 15cm. In embankments etc. formed by excavated earth |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/031 |
Cement (Grade - 53) Portland |
Limited |
19-Jun-07 |
Single |
28-Jun-07 |
3 |
3 (Asian Enterprises, New City
Agency, Shree Durga Traders) |
Nil |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/031 Dt.
29.06.07 |
Asian Enterprises |
317800 |
2 days from order, delivery may be
staggered as per site requirment. |
29-Jun-07 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ENQ/BLL/2007-08/4 |
Networking Items & Cable
Laying |
Limited |
08.05.2007 |
Single |
15.05.2007 |
3 |
Ava Software, Forte, Microsyst |
NIL |
L(1) |
ITE011/NIH/41 Dated 01.06.2007 |
Forte |
0.71 |
within 1 week |
4.062007 |
08.06.2007 |
|
| ENQ/BLL/2007-08/6 |
Computer Consumables Items |
Limited |
18.05.2007 |
Single |
28.05.2007 |
3 |
The Reproduction India, P.C.forms
& Stationery, Myrinda Systems |
NIL |
L(1) |
SYS/CON/Y/2007-08/1 Dated -07.06.2007 |
P.C.Forms
& Stationery |
Annual
Contract ( deliver the goods when intimated by us mentioning the quantity ) |
|
|
|
|
| |
|
|
|
|
|
|
|
|
L(1) |
SYS/CON/Y/2007-08/2 Dated -07.06.2007 |
The Reproduction India |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
L(1) |
SYS/CON/Y/2007-08/3 Dated -07.06.2007 |
Myrinda Systems |
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/305 |
Top ,Middle , Bottom Cover |
Limited |
15-May-07 |
Single |
30-May-07 |
3 |
N/A |
N/A |
L(1) |
HR/42589, dt.29.6.07 |
SANTI FIBRE INDUSTRIES (INDI |
3.64 |
SEP'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/306 |
I.ch.wiring |
Limited |
18-May-07 |
Single |
24-May-07 |
2 |
N/A |
N/A |
L(1) |
HR/42462/5921,dt.2.6.07 |
AMIYA INDUSTRIES |
4.68 |
AUG'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/42463/5921,dt.2.6.07 |
OPG POWER SYSTEMS PVT. LTD., |
3.63 |
" |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/307 |
C.F.Steel |
Limited |
21-May-07 |
Single |
28-May-07 |
3 |
N/A |
N/A |
L(1) |
HR/42470, dt.5.6.07 |
CONTINENTAL STEEL SYNDICATE |
1.32 |
SEP'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/308 |
Drive Stud |
Limited |
24-May-07 |
Single |
31-May-07 |
2 |
N/A |
N/A |
L(1) |
HR/42497, dt.8.6.07 |
TAPATI ELECTRICALS |
0.22 |
AUG'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/309 |
Power Pack |
Limited |
25-May-07 |
Single |
2-Jun-07 |
2 |
N/A |
N/A |
L(1) |
HR/42492/3396,dt.8.6.07 |
GITA ELECTRICAL & ELECTRONIC |
0.58 |
AUG'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/310 |
Fabricated items |
Limited |
6-Jun-07 |
Single |
12-Jun-07 |
2 |
N/A |
N/A |
L(1) |
HR/42560, dt.23.6.07 |
NAVA BHARAT ENTERPRISE |
2.21 |
SEP'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/42559, dt.23.6.07 |
S & S ENTERPRISE |
0.55 |
" |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/311 |
H.Cr.Tool steel |
Limited |
15-Jun-07 |
Single |
23-Jun-07 |
3 |
N/A |
N/A |
L(1) |
HR/42584, dt.28.6.07 |
HARENDRA INDUSTRIES |
0.89 |
SEP'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/312 |
M.S.Flats |
Limited |
15-Jun-07 |
Single |
23-Jun-07 |
2 |
N/A |
N/A |
L(1) |
HR/42583 dt.28.6.07 |
CONTINENTAL STEEL SYNDICATE |
3.10 |
SEP'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/313 |
Hydraulic oil |
Limited |
16-Jun-07 |
Single |
23-Jun-07 |
2 |
N/A |
N/A |
L(1) |
HR/42575 dt.27.6.07 |
INDUSTRIAL OIL CO. (1971) |
0.50 |
JUN'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/314 |
Brass Nuts,screw |
Limited |
16-Jun-07 |
Single |
23-Jun-07 |
3 |
N/A |
N/A |
L(1) |
HR/42586, dt.29.6.07 |
B.B.GHOSH&CO. |
0.95 |
SEP'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/42588, dt.29.6.07 |
UTTAM ENTERPRISES |
0.02 |
" |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/42587, dt.29.06.07 |
WESTERN TRADING CORPORATION |
0.39 |
" |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| AD/ENQ/0301 |
New Shed for new CNC Machine |
Limited Tender |
18.04.07 |
Two |
30.04.07 |
1 |
1) SHAHIN ENTERPRISE |
N/A |
L1 |
AD/HR/2000/SER DT. 08.06.2007 |
M/S SHAHIN ENTERPRISE |
1.64 |
60 Days |
|
|
|
| BLL-PT/001/2007-08 |
Cooking
& Daily Distribution of Cooked/Dry Food & Hot Tea |
Public Tender |
23.04.07 |
Two |
14.05.07 |
3 |
2) M/S GEMS & M/S PARADISE
ENTERPRISE |
1) M/S CHATTERJEE HOTEL &
SWEETS |
L1 |
AD/HR/2001/WLFDT. 08.06.2007 |
M/S GEMS |
44.46 |
1 Year |
01.07.07 |
30.06.08 |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8916/AS |
Mfg. Of New commutator |
LMITED |
24/05/07 |
SINGLE |
31/05/07 |
2 |
The Bengal Commutator Works,
Dolphin Electric(I) |
nil |
L-1 |
MB/11055/ER, Dt: 16/06/07 |
The Bengal Commutator Works. |
0.94 |
1No within 20 days and
balance in july-07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8862/AS |
EN.Copper Cond. |
LIMITED |
14/05/07 |
SINGLE |
21/05/07 |
2 |
PARAMOUNT COND., SWARNAGIRI WIRE
INSULATION |
nil |
L-1 |
MB/11029/ER Dt: 06/06/07 |
SWARNAGIRI WIRE INSULATIONS
PVT.LTD. |
0.93 |
WITHIN 30 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8917/AS |
PGMP. TAPE |
LIMITED |
14/05/07 |
SINGLE |
21/05/07 |
3 |
AGATE ELECTRO INSULANTS, HATIM
DIELECTRIC, LAKSHMANAN ISOLA |
nil |
L-1 |
MB/11025/ER Dt: 05/06/07 |
HATIM DIELECTRIC PVT.LTD |
1.31 |
1000 ROLLS IMMEDIATELY, BALANCE ON
REQUEST. |
|
|
|
| 8895/AS |
H-71 THINNER-218 THINNER-T 234 DR.BECK VARNISH ELMO THERM -H71A VARNISH |
LIMITED |
16/05/2007 |
SINGLE |
24/05/07 |
3 |
BRITISH ELECTRIC MANUFACTURING CO,
HATIM AND CO, CMDA. |
NIL |
L-1 |
MB/11042/ER DT: 11/06/07 |
BRITISH ELRCTRIC MANUFACTURING CO |
2.74 |
ON REQUEST. |
|
|
|
| 8896/AS |
DGC COPPER CONDUCTOR 6.45X6.45
MM2 |
LIMITED |
17/05/07 |
SINGLE |
24/05/07 |
1 |
PARAMOUNT CONDUCTORS LTD. |
NIL |
L-1 |
MB/11024/ER DT: 05/06/2007 |
PARAMOUNT CONDUCTORS LTD. |
0.86 |
WITHIN 15 DAYS |
|
|
|
| 8919/AS |
KAPTON COVERED COPPER COND. |
LIMITED |
24/05/07 |
SINGLE |
31/05/07 |
1 |
PEARL INSULATIONS PVT.LTD. |
nil |
L-1 |
MB/11026/ER Dt:07/06/07 |
PEARL INSULATIONS PVT.LTD. |
1.63 |
WITHIN 3 WEEKS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8920/AS |
Mfg. Of New Silver Bearing
commutator |
LIMITED |
24/05/07 |
SINGLE |
31/05/07 |
2 |
The Bengal Commutator Works,
Dolphin Electric(I) |
nil |
L-1 |
MB/11056/ER dt: 16/06/07 |
DOLPHINE ELECTRIC (I) |
2.37 |
within 6 weeks |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8886/AS |
Mfg. Of New Silver Bearing
commutator |
LIMITED |
15/05/07 |
SINGLE |
22/05/07 |
2 |
The Bengal Commutator Works,
Dolphin Electric(I) |
nil |
L-1 |
MB/11080/ER Dt: 23/06/07 |
THE BENGAL COMMUTATORS WORKS. |
####### |
60 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8921/AS |
Mfg. Of New Silver Bearing
commutator |
LIMITED |
24/05/07 |
SINGLE |
31/05/07 |
2 |
The Bengal Commutator Works,
Dolphin Electric(I) |
nil |
L-1 |
MB/11079/ER DT: 23/06/07 |
THE BENGAL COMMUTATORS WORKS. |
1.29 |
45 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8901/AS |
G.T.SHEET-2MM, 0.5MM, 0.3MM, 1MM |
LIMITED |
18/05/07 |
SINGLE |
25/05/07 |
2 |
HIND ASSOCIATES , M.S. INDUSTRIES |
nil |
L-1 |
MB/11065/ER DT:19/06/07 &
MB/11066/ER |
M.S. INDUSTRIES & HIND
ASSOCIATES |
114296.00 & 9776.00 |
ON REQUEST & 20 NOS WITHIN 7
DAYS AND BALANCE ON REQUEST |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8940/AS |
35Sq.MM A.T.C.C . 6.6KV GR.
SINGLE CORE CABLE |
LIMITED |
2/6/2007 |
SINGLE |
8/6/2007 |
2 |
BRITISH ELECTRIC Mfg.CO, NISHANT
MARKETING & Mfg.CO |
nil |
L-1 |
MB/11062/ER DT: 18/06/07 |
BRITISH ELECTRIC Mfg.CO |
0.65 |
WITHIN 3 WEEKS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8918/AS |
EN.DGC.COPPER COND. |
LIMITED |
24/05/07 |
SINGLE |
31/05/07 |
2 |
PARAMOUNT COND., SWARNAGIRI WIRE
INSULATION |
nil |
L-1 |
MB/11060/ER DT:18/06/07 |
SWARNAGIRI WIRE INSULATIONS
PVT.LTD. |
0.73 |
WITHIN 30 DAYS. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8865/AS |
16 SWG.CU.SHEET |
LIMITED |
14/05/06 |
SINGLE |
21/05/07 |
3 |
A.B ENTERPRISE, B.D. ENTERPRISE,
CONCORDENT. |
nil |
L-1 |
MB/11064/ER DT:19/06/07 |
CONCORDENT |
0.56 |
ON REQUEST |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8964/AS |
MICAPAG.EP FOLIUM SAMICA THERM
WRAPPER. |
LIMITED |
11/6/2007 |
SINGLE |
16/06/07 |
3 |
AGATE ELECTRO, ISOVOLTA ,
LAKSHMANAN ISOLA |
nil |
L-1 |
MB/11061/ER DT:18/06/07 |
ISOVOLTA (I) PVT.LTD. |
1.5 |
400 MTRS WITHIN 7 DAYS BALANCE ON
REQUEST. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8966/AS |
20MM X 50MT X 2MIL NOMEX TAPE |
LIMITED |
14/06/07 |
SINGLE |
19/06/07 |
2 |
COMMERCIAL SUPPLY SYNDICATE
M.S.INDUSTRIES |
nil |
L-1 |
MB/11081/ER DT.25/06/07 |
M.S.INDUSTRIES |
0.58 |
ON REQUEST |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8948/AS |
BARE COPPER COND. |
LIMITED |
8/6/2007 |
SINGLE |
14/06/07 |
2 |
PARAMOUNT CONDUCTORS LTD. |
nil |
L-1 |
MB/11068/ER DT.19/06/07 |
PARAMOUNTS CONDUCTORS LTD. |
1.98 |
WITHIN 15 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8922/AS |
EN DGC COPPER COND. |
LIMITED |
24/05/07 |
SINGLE |
31/05/07 |
2 |
PARAMOUNT CODUCTORS LTD.
SWARNAGIRI WIRE INSULATIONS PVT.LTD. |
nil |
L-1 |
MB/11058/ER DT.18/06/07 |
SWARNAGIRI WIRE INSULATION
PVT.LTD. |
0.6 |
WITHIN 4 WEEKS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8930/AS |
EN.DGC.COPPER COND.(3.0X9.0)MM2
E2 D1F |
LIMITED |
24/05/07 |
SINGLE |
31/05/07 |
3 |
PARAMOUNT CODUCTORS LTD.
SWARNAGIRI WIRE INSULATIONS PVT.LTD.PEARL INSULATOPN. |
NIL |
L-1 |
MB/11047/ER DT: 13/06/2007 |
PARAMOUNT CONDUCTORS LTD. |
2.2 |
WITHIN 15
DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8965/AS |
ROLLER BEARING NU-2334 |
LIMITED |
12/6/2007 |
SINGLE |
16/06/07 |
2 |
ISHAN INTERNATIONAL UDAY
ENTERPRISE |
nil |
L-1 |
MB/11069/ER DT.20/06/07 |
ISHAN INTERNATIONAL |
1.17 |
WITHIN SEVEN DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8861/AS |
ENAMELLED
CU.COND. |
LIMITED |
14/5/2007 |
SINGLE |
21/05/2007 |
|
PARAMOUNT
COND.PVT.LTD. SWARNAGIRI WIRE INSUL (P) LTD |
NIL |
L-1 |
MB/11028/ER
Dt. 06/06/07 |
SWARNAGIRI
WIRE INSU(P) LTD. |
56556.5 |
WITHIN
30 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|