| BIECCO LAWRIE
LIMITED |
|
| DETAILS OF
CONTRACTS CONCLUDED DURING THE MONTH OF JULY '2007.(VALUE > Rs.50,000/-) |
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 1 |
2 |
3 |
4 |
5 |
6 |
7 |
8 |
9 |
10 |
11 |
12 |
13 |
14 |
15 |
16 |
17 |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| Tender No. |
Item/Nature of work |
Mode of Tender Enquiry |
Date of Publication of NIT |
Type of Bidding (Single/Two Bid
System) |
Last date of receipt of tender |
Nos of tenders recd. |
Nos. and names of parties
qualified after technical evaluation. |
Nos. and names of parties not
qualified after technical evaluation. |
Whether contract awarded to lowest
tenderer/ evaluated L(1). |
Contract No. & Date |
Name of Contractor |
Value of Contract (Rs.lacs) |
Scheduled date of completion of
supplies. |
Actual date of start of work |
Actual date of completion |
Reasons for dealys if any |
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/029 |
Earth work in excavation in fdn. Trenches, drains etc. (not
exceeding 2 m in width or 10 sqm on plan ) including dressing of sides &
ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil
& disposal of surplus excavated soils as directed within a lead of 50 m complete as per
specifications, drawing & instruction of Engineer-in -Charge : |
Limited |
13-Jun-07 |
Single |
22-Jun-07 |
3 |
3 (Mahto Enterprises, Jai Maa Kali
Enterprises, Satyanarayan Ray) |
Nil |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/032 Dt.
09.07.07 |
Mahto Enterprises |
224998 |
60 days |
12-Jul-07 |
|
|
| |
All kinds of soil |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Ordinary rock |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hard rock ( requiring blasting) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Hard rock ( blasting prohibited
) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Extra over item (1) above for excavation in all kinds of
soil & rock : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
For
each additional lift of 1.5 m or part thereof over the initial lift |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
For each additional lead of 50 m
or part thereof beyond the initial lead of 50 m, but upto a maximum of 100.0
m in total (i.e. max. 2 leads) beyond the initial lead. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Earthwork in filling in trenches, plinth & sides of
foundation etc. in layers not exceeding 200 mm in depth, consolidating &
dressing each deposited layer by ramming & watering, lead upto 50 m &
lift upto 1.5m including cost of carriage of materials etc. complete as per
drgs., specifications & directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
with excavated earth ( excluding
rock ) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying in position plain cement
concrete with coarse sand & well graded, washed & screened stone
aggregates of approved quality and size 20 mm & down including mixing,
vibrating, curing etc. complete but excluding centering & shuttering as
per drawings, specification & direction in foundation & plinth. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Mix 1 : 3 : 6 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Laying in position Reinforced
Cement concrete work with coarse sand & 20 mm. & down stone
aggregates of approved quality, well
graded, washed and screened including cost of transport of all materials to
site., mixing, laying, vibrating, curing etc. complete but excluding the cost
of reinforcement and formwork as per drgs., specifications & directions
in foundation, beam & Column with
: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Concrete mix 1: 2 : 4 |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour charges for Laying,
straightening, cutting, bending, cranking, hooking, fixing, binding &
placing at any position in superstructure, fdn., & plinth with MS /
Torsteel reinforcements in all works of concrete, masonry etc, including
supply of binding wire with 18 SWG (1.05mm) galvanised wire twisted tight and
/ or welding the splices where necessary as per IS codes or direction and
holding in position with steel rod spacer / chairs / horses etc. complete. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Labour Charges & Hiring Charges for erecting, centering, supporting, striking, cleaning etc.
of formwork of approved design with staging, props and supports for plain & RCC works with all
accessories and at all heights including removal of forms as per drawings,
specifications & directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Cement plaster to walls & R.C.C. structures including all
necessary scaffolding, curing, rounding off, chamfering etc. complete at all
heights as per drg, spec. & directions. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
12 mm th. cement plaster |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
With mix 1:6 ( 1 Cement : 6 Coarse sand ) |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Brickwork in superstructure with Bricks of Class designation 50
& cement mortar with coarse sand as specified below including supply & carriage of all
materials to site, scaffolding & curing complete as per drg.,
specifications and directions : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
a)12mm th. with 1: 6 cement mortar |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
TOTAL : |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
Note: |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
All costruction materials and Equipments are to be supplied by the contractor. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
All VAT invoices of
the procured materials by the contractor to
be forwarded to BLL for sales tax formalities. |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/032 |
TMT BAR (Fe 415) - 8 mm |
Limited |
25-Jun-07 |
Single |
4-Jul-07 |
3 |
3 (Jai Matadi Enterprises, Sandeep
Enerprises, Hemadri Steel Traders) |
Nil |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/033 Dt.
11.07.07 |
Sandeep Enterprises |
353710 |
3 days, delivery may be staggered. |
14-Jul-07 |
|
|
| |
TMT BAR (Fe 415) - 10 mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
TMT BAR (Fe 415) - 12 mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
TMT BAR (Fe 415) - 16 mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
TMT BAR (Fe 415) - 20 mm |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PROJ/DVC-BIADA/030 |
Supply and delivery of
36KV,10KA,Heavyduty gapeless Lightning Arrestors for DVC-Biada project. |
Limited |
18-Jun-07 |
Single |
28-Jun-07 |
4 |
4 (Elpro Intermnational, Oblum
Electricals, Cromton Greaves, Lamco) |
Nil |
Lowest tender(L1) |
BLL/PROJ/DVC-BIADA/ORD/034 Dt.
28.07.07 |
Oblum Electricals |
82231 |
1 month from drg. Approval |
28-Jul-07 |
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/315 |
FABRICATED COMPONENTS |
LIMITED |
19-Jun-07 |
SINGLE |
26-Jun-07 |
2 |
N/A |
N/A |
L(1) |
HR/42618, dt.9.7.07 |
AMIYA INDUSTRIES |
2.49 |
DEC'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/317 |
MS/BRASS HEX HD.SCREW &
NUTS(FASTENERS) |
LIMITED |
25-Jun-07 |
SINGLE |
29-Jun-07 |
2 |
N/A |
N/A |
L(1) |
HR/42609, dt. 6.7.07 |
B.B.GHOSH&CO. |
0.92 |
SEP'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/42610 , dt. 6.7.07 |
SANJOY HARDWARE AGENCY |
0.21 |
SEP'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/318 |
FABRICATED COMPONENTS |
LIMITED |
25-Jun-07 |
SINGLE |
2-Jul-07 |
3 |
N/A |
N/A |
L(1) |
HR/42662, dt. 18.7.07 |
NAVA BHARAT ENTERPRISE |
0.47 |
DEC'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
HR/42663, dt.18.7.07 |
S & S ENTERPRISE |
0.47 |
DEC'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/320 |
WIRING WORK AT BLL |
LIMITED |
27-Jun-07 |
SINGLE |
5-Jul-07 |
5 |
N/A |
N/A |
L(1) |
HR/42639/JOB, dt.13.7.07 |
AMBER ELECTRICAL & ELECTRONICS |
4.41 |
MAR'08 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/321 |
PHTHALIC ANHYDIDE(HARDENER) |
LIMITED |
5-Jul-07 |
SINGLE |
14-Jul-07 |
2 |
N/A |
N/A |
L(1) |
HR/42695, dt.26.7.07 |
BHARAT MERCANTILE CORPORATION |
2.87 |
OCT'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| BLL/324 |
PACKING WOOD/CHUTE |
LIMITED |
17-Jul-07 |
SINGLE |
24-Jul-07 |
2 |
N/A |
N/A |
L(1) |
HR/42715, dt.31.7.07 |
HASSAN BROTHERS |
1.77 |
DEC'07 |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| AD/ENQ/0305 |
RENOVATION OF PACKING SHED AT
SGW |
Limited Tender |
30.04.07 |
Two |
16.05.07 |
2 |
1) SHAHIN ENTERPRISE 2) APEX
CONSTRUCTION |
N/A |
L1 |
AD/HR/2017/SER DT. 20.07.2007 |
M/S APEX CONSTRUCTION |
6.79 |
60 Days |
|
|
|
| AD/ENQ/0337 |
LABOUR CHARGE FOR BITUMEN
PAINTING |
Limited Tender |
10.07.07 |
Single |
17.07.07 |
2 |
1) SUNITI NASKAR 2) DUTTCON |
N/A |
L1 |
AD/HR/2022/SERDT. 25.07.2007 |
M/S SUNITI NASKAR |
0.45 |
|
|
|
|
| PUR/8995/AS |
ELMOTHERM
H71 VARNISH |
LIMITED |
26/06/2007 |
SINGLE |
2/7/2007 |
3 |
BRITISH
ELECTRIC MFG.CO., CMD TECHNO, HATIM AND COMPANY |
NIL |
L-1 |
MB/11122/ER
DT.16/7/07 |
BRITISH
ELECTRIC MFG.CO. |
1.76 |
ON
REQUEST |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9004/AS |
EN
DGC COPPER COND AS PER IS 10114-(5.96X3.1) |
LIMITED |
30/06/2007 |
SINGLE |
7/7/2007 |
3 |
PARAMOUNT
CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS
(P)LTD. |
NIL |
L-1 |
MB/11096/ER
DT.11/07/07 |
SAGUN
COPPER CONDUCTORS(P) LTD. |
0.84 |
15
DAYS FROM THE DATE OF RECEIPT OF OUR ORDER |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/8946/SP |
LABOUR
CHARGES FOR FORMING OF ARMATURE COILS. SCOPE:FORMING OF ARMATURE COILS AS PER
SAMPLE. |
LIMITED |
7/6/2007 |
SINGLE |
14/06/07 |
2 |
CHILLMECH
TECHNO PVT.LTD. MA-KALI ENG.WORKS. |
NIL |
L-1 |
MB/11102/ER
DT: 11/07/2007 |
MA-KALI
ENG.WORKS. |
0.52 |
WITHIN
10 DAYS FROM THE DATE OF ORDER. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8904/SP |
HARD
DRAWN COPPER BAR FOR LOWER CAGE DIA 16 MM X 18 MM LENGTH: 825MM. COND.99.95%. |
LIMITED |
28/05/2007 |
SINGLE |
4/6/2007 |
2 |
J.S.
INDUSTRIES MA-KALI ENG.WORKS |
NIL |
L-1 |
MB/11100/ER
DT: 11/07/2007 |
MA-KALI
ENG.WORKS. |
0.63 |
10
DAYS FROM THE DATE OF ORDER. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9010/AS |
MFG
OF NEW SILVER BEARING COMMUTATOR ( SEGMENT: 150 ) |
LIMITED |
3/7/2007 |
SINGLE |
10/7/2007 |
2 |
THE
BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA) |
NIL |
L-1 |
MB/11138/ER
DT.21/07/07 |
THE
BENGAL COMMUTATORS WORKS |
4.76 |
WITHIN
60 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9011/AS |
MFG
OF NEW COMMUTATOR (SEGMENT: 150 ) |
LIMITED |
3/7/2007 |
SINGLE |
10/7/2007 |
2 |
THE
BENGAL COMMUTATOR WORKS, DOLPHIN ELECTRIC (INDIA) |
NIL |
L-1 |
MB/11141/ER
DT.21/07/07 |
THE
BENGAL COMMUTATOR WORKS |
2.13 |
WITHIN
45 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9028/AS |
MFG
OF NEW COMMUTATOR AS PER SAMPLE/DRAWING |
LIMITED |
10/7/2007 |
SINGLE |
16/07/07 |
2 |
THE
BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA) |
NIL |
L-1 |
MB/11140/ER
DT.21/07/07 |
THE
BENGAL COMMUTATORS WORKS |
3.54 |
WITHIN
60 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9030/AS |
SILVER
BRG.COMMUTATOR AS PER DIMENSION.232 SEG. |
LIMITED |
11/7/2007 |
SINGLE |
17/07/07 |
2 |
THE
BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA) |
NIL |
L-1 |
MB/11139/ER
DT.21/07/07 |
THE
BENGAL COMMUTATORS WORKS |
0.78 |
WITHIN
45 DAYS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8889/SP |
LABOUR
CHARGES FOR FORMIG OF IP. COILS 05 TO 15 KGS. |
LIMITED |
16/05/2007 |
SINGLE |
24/05/2007 |
3 |
BABCO
ELECTRICAL, CHILL MECH TECHNO, MA-KALI ENG.WORKS. |
NIL |
L-1 |
MB/11117/ER,
MB/11118/ER, MB/11119/ER DT: 13.07.2007 |
BABCO
ELECTRICAL, CHILL MECH TECHNO, MA-KALI ENG.WORKS. |
17400.00 11600.00, 29000.00 |
14
DAYS FROM THE DATE OF APPROVED SAMPLE FOR EACH JOB. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8881/SP |
LABOUR
CHARGES FOR FORMIG & MOULDING 6.6KV.STATOR COILS 3 TO 6 KGS. |
LIMITED |
16/05/2007 |
SINGLE |
24/05/2007 |
2 |
B.P.
ENTERPRISE, EMIC MOTORS PVT.LTD. |
NIL |
L-1 |
MB/11130/ER & MB/11129/ER DT: 16/07/07 |
EMIC MOTORS, B.P. ENTER PRISE |
75000.00
75000.00 |
WITHIN
21 DAYS FROM THE DATE OF APPROVED SAMPLE FOR EACH JOB. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8876/SP |
LABOUR
CHARGES FOR FORMIG & TAPING OF Armature coils as per sample 2 Kgs to 3
Kgs. |
LIMITED |
16/05/2007 |
SINGLE |
24/05/2007 |
3 |
BABCO
ELECTRICALS, CHILLMECH TECHNO , EMIC MOTORS PVT.LTD. MA-KALI ENG. WORKS. |
NIL |
L-1 |
MB/
11114/ER , MB/ 11115/ER , MB/11116/ER DT: 13/07/2007 |
BABCO
ELECTRICALS, CHILLMECH TECHNO , EMIC MOTORS PVT.LTD. MA-KALI ENG. WORKS. |
16000.00,
32000.00 , 32000.00 |
WITHIN
10 DAYS FROM THE DATE OF APPROVED SAMPLE FOR EACH JOB. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8875/SP |
LABOUR
CHARGES FOR FORMIG & TAPING OF Armature coils as per sample 1 Kgs to 2
Kgs. |
LIMITED |
16/05/2007 |
SINGLE |
24/05/2007 |
3 |
BABCO
ELECTRICALS, CHILLMECH TECHNO , EMIC MOTORS PVT.LTD. MA-KALI ENG. WORKS. |
NIL |
L-1 |
MB/
11109/ER, MB/11110/ER, MB/11111/ER, DT: 13/07/2007 |
BABCO
ELECTRICALS, CHILLMECH TECHNO , EMIC MOTORS PVT.LTD. MA-KALI ENG. WORKS. |
31500.00
, 42000.00, 31500.00 |
14
DAYS FROM THE DATE OF APPROVED SAMPLE FOR EACH JOB. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8874/SP |
LABOUR
CHARGES FOR FORMIG & TAPING OF Armature coils as per sample 250 Grms.to 1
Kgs. |
LIMITED |
16/05/2007 |
SINGLE |
24/05/2007 |
3 |
BABCO
ELECTRICALS, CHILLMECH TECHNO , EMIC MOTORS PVT.LTD. MA-KALI ENG. WORKS. |
NIL |
L-1 |
MB/11112/ER,
MB/11113/ER, DT: 13/07/2007 |
BABCO
ELECTRICALS , CHILLMECH TECHNO. |
28800.00 43200.00 |
WITHIN
10 DAYS FROM THE DATE OF APPROVED SAMPLE FOR EACH JOB. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 8871/SP |
LABOUR
CHARGES FOR FORMIG & TAPING OF MP. COILS STRIP COND. 20 Kgs.TO 40 Kgs. |
LIMITED |
16/05/2007 |
SINGLE |
24/05/2007 |
4 |
BABCO
ELECTRICALS, CHILLMECH TECHNO , EMIC MOTORS PVT.LTD. MA-KALI ENG. WORKS. |
NIL |
L-1 |
MB/11127/ER,
MB/11128/ER, DT: 16/07/2007 |
CHILLMECH
TECHNO PVT.LTD. MA-KALI ENG WORKS. |
28800.00 67200.00 |
14
DAYS FROM THE DATE OF APPROVED SAMPLE FOR EACH JOB. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/8984/Sp |
Metallizing
of DE & NDE side Bush journal & Rotor Dynamic Balencing. |
LIMITED |
25/06/2007 |
SINGLE |
2/7/2007 |
2 |
ESDEE
ELECTRO MILL PVT.LTD MA-KALI
ENG.WORKS. |
NIL |
L-1 |
MB/11108/ER
DT: 13/07/2007 |
ESDEE
ELECTRO MILL PVT.LTD. |
179450 |
4WEEKS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9025/AS |
BARE,
CU COND (2-5X44-75)MMFOR IPCOIL-IS 6160 |
LIMITED |
10/7/2007 |
SINGLE |
16/07/07 |
1 |
PARAMOUNT
CONDUCTORS LTD. |
NIL |
L-1 |
MB/11174/ER
DT: 31/07/2007 |
PARAMOUNT
CONDUCTORS LTD. |
194950 |
15
DAYS FROM THE DATE OF ORDER |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9009/AS |
KAPTON
COVER COPPER COND. (2.7 X 7.00 +- 0.5) IS 9148-1979 |
LIMITED |
3/7/2007 |
SINGLE |
9/7/2007 |
1 |
PEARL
INSULATIONS PRIVATE LTD. |
NIL |
L-1 |
MB/11121/ER
DT.16/07/07 |
PEARL
INSULATIONS PRIVATE LTD. |
395916 |
WITHIN
8 WEEKS |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9040/AS |
ENAMELLED
COPPER CONDUCTOR(1.78X3.00)MM2,E2,F |
LIMITED |
13/07/07 |
SINGLE |
19/07/07 |
2 |
PARAMOUNT
CONDUCTORS LT. SAGUN COPPER CONDUCTORS (P)LTD. |
NIL |
L-1 |
MB/11164/ER
DT: 28/07/2007 |
SAGUN
COPPER COND.PVT.LTD. |
180106 |
3
WEEKS FROM THE DATE OF RECEIPTS OF ORDER. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9005/AS |
DGC
CU.COND.CL-F,G2 (1.40 X 3.70 +- 0.5) IS 4685 |
LIMITED |
3/7/2007 |
SINGLE |
9/7/2007 |
3 |
PARAMOUNT
CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS
(P)LTD. |
NIL |
L-1 |
MB/11166/ER
DT: 27/07/07 |
SWARNA
GIRI WIRE INSULATION PVT,LTD. |
95358.1 |
4
WEEKS FROM THE DATE OF RECEIPT OF ORDER |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9014/AS |
EN.DGC.CU
COND.(4.0+-05X2.6+-03)MM2 |
LIMITED |
7/7/2007 |
SINGLE |
13/07/07 |
4 |
PARAMOUNT
CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS
(P)LTD.PEARL INSULATIONS PVT.LTD |
NIL |
L-1 |
MB/11165/ER
DT: 27/07/2007 |
M/S
SWARNA GIRI WIRE INSULATIONS PVT.LTD. |
195515 |
4 WEEKS FROM THE DATE OF
RECEIPT ORDER |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9026/AS |
DGC
COPPER COND FOR MAIN POLE COIL |
LIMITED |
10/7/2007 |
SINGLE |
16/07/07 |
3 |
PARAMOUNT
CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS
(P)LTD. |
NIL |
L-1 |
MB/11167/ER
DT: 28/07/07 |
SAGUN
COPPER COND.PVT.LTD. |
472003 |
3
WEEKS FROM THE DATE OF RECEIPTS OF ORDER. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| PUR/9027/AS |
EN.COPPER
COND AS IS-3855, GR OF COVERING-E2 |
LIMITED |
10/7/2007 |
SINGLE |
16/07/07 |
3 |
PARAMOUNT
CONDUCTORS LT. SWARNAGIRI WIRE INSULATIONS PVT.LTD., SAGUN COPPER CONDUCTORS
(P)LTD. |
NIL |
L-1 |
MB/11168/ER
DT: 27/07/07 |
SWARNA
GIRI WIRE INSULATIONS PVT. LTD. |
107797 |
4
WEEKS FROM THE DATE OF RECEIPTS OF ORDER. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9054/AS |
MFG
OF SILVER BEARING COMMUTATOR AS PER
SAMPLE |
LIMITED |
18/07/07 |
SINGLE |
24/07/07 |
3 |
THE
BENGAL COMMUTATORS WORKS, DOLPHIN ELECTRIC (INDIA)COMMUTATOR MFG. |
NIL |
L-1 |
MB/11177/ER
DT.31/07/07 |
COMMUTATOR
MFG. |
76960 |
WITHIN
30 DAYS FROM THE DATE OF RECEIVED SAMPLE. |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9035/AS |
35
SQ,MM, A.T.C.C, 6.6 KV.GR. SINGLE CORE CABLE |
LIMITED |
11/7/2007 |
SINGLE |
25/07/07 |
2 |
BRITISH
ELECTRIC MFG. CO. NISHANT MARKETING &MFG.CO |
NIL |
L-1 |
MB/11175/ER |
BRITISH
ELECTRIC MFG.CO. |
0.65 |
WITHIN
6 WEEK |
|
|
|
| |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| 9038/AS |
MFG.
NEW COMMUTATOR AS PER SAMPLE SEG LENGTH:100 MM NO. OF SEGMENT: 139, RISER
WIDTH:18MM, SEGMENT DIA:242MM ,RISER DIA:278MM. |
LIMITED |
13/07/07 |
SINGLE |
20/07/07 |
3 |
THE
BENGAL COMMUTATOR WORKS, COMMUTATOR MFG.
DOLPHIN ELECTRIC (I) |
NIL |
L-1 |
MB/11169/ER
DT: 27/07/07 |
THE
BENGAL COMMUTATOR WORKS. |
0.82 |
45
DAYS FROM THE DATE OF RECEIVED OF SAMPLE |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|