| BIECCO LAWRIE LIMITED | ||||||||||||||||
| DETAILS OF CONTRACTS CONCLUDED DURING THE MONTH OFAUGUST'2008.(VALUE > Rs.50,000/-) | ||||||||||||||||
| 1 | 2 | 3 | 4 | 5 | 6 | 7 | 8 | 9 | 10 | 11 | 12 | 13 | 14 | 15 | 16 | 17 |
| Tender No. | Item/Nature of work | Mode of Tender Enquiry | Date of Publication of NIT | Type of Bidding (Single/Two Bid System) | Last date of receipt of tender | Nos of tenders recd. | Nos. and names of parties qualified after technical evaluation. | Nos. and names of parties not qualified after technical evaluation. | Whether contract awarded to lowest tenderer/ evaluated L(1). | Contract No. & Date | Name of Contractor | Value of Contract (Rs.lacs) | Scheduled date of completion of supplies. | Actual date of start of work | Actual date of completion | Reasons for dealys if any |
| PROJ/DVC-BIADA/088 | Earthing | Limited | 19-Jul-08 | Single | 25-Jul-08 | 3 | 3 (S.S.D. Consulting Engineers, R.A. Industrial Services, UE Consultants & Engineers Private Limited) | nil | Lowest tender(L1) | BLL/PROJ/DVC-BIADA/ORD/078 Dt. 04.08.08 | R.A. Industrial Services | 174158 | 60 days | 4-Aug-08 | ||
| For Biada | ||||||||||||||||
| Earthing Design Calculation as per IEEE | ||||||||||||||||
| Sub Station Earthing Layout Drawing including details drawing for junction points. | ||||||||||||||||
| Typical Structure Earthing Details | ||||||||||||||||
| Earthing materials quantity calculations | ||||||||||||||||
| For Chandrapura | ||||||||||||||||
| Earthing Design Calculation as per IEEE | ||||||||||||||||
| Sub Station Earthing Layout Drawing including details drawing for junction points. | ||||||||||||||||
| Typical Structure Earthing Details | ||||||||||||||||
| Earthing materials quantity calculations | ||||||||||||||||
| Equipment and Cable Trench Layout : | ||||||||||||||||
| For Biada | ||||||||||||||||
| Sub Station Equipment Layout Plan Drawing | ||||||||||||||||
| Elevation for Switchyard | ||||||||||||||||
| Connectors and Al. Pipe Bus details calculation or quantity | ||||||||||||||||
| Cable Trench Layout in Sub Station | ||||||||||||||||
| Cable Trench Layout in Control Room | ||||||||||||||||
| Details sectional drawing for cable trenches | ||||||||||||||||
| Equipments Layout in control room | ||||||||||||||||
| Foundation Layout in Sub Station | ||||||||||||||||
| For Chandrapura | ||||||||||||||||
| Sub Station Equipment Layout Plan Drawing | ||||||||||||||||
| Elevation for Switchyard | ||||||||||||||||
| Connectors and Al. Pipe Bus details calculation or quantity | ||||||||||||||||
| Cable Trench Layout in Sub Station | ||||||||||||||||
| Foundation Layout in Sub Station | ||||||||||||||||
| Lighting | ||||||||||||||||
| Sub Station Outdoor Lighting Layout Drawing | ||||||||||||||||
| Control Room indoor lighting Layout Drawing | ||||||||||||||||
| Total quantity measurement of Indoor & Outdoor Lighting materials | ||||||||||||||||
| Cable route drawing for lighting (Indoor & Outdoor) | ||||||||||||||||
| Street light Pole Position drawing including Gate Light | ||||||||||||||||
| Master Single line diagram for AC Distribution System including Lighting | ||||||||||||||||
| Equipment Specification with BOM | ||||||||||||||||
| Main Lighting Distribution Boards | ||||||||||||||||
| Sub Lighting Distribution Boards | ||||||||||||||||
| CTJB & PTJB | ||||||||||||||||
| ACJB for Incoming Auxiliary Power Supply Sub Station equipments | ||||||||||||||||
| Street light Pole JB | ||||||||||||||||
| Gate Light Pole JB | ||||||||||||||||
| Switchyard Lighting JB | ||||||||||||||||
| Power DB for Welding | ||||||||||||||||
| Cable Schedule | ||||||||||||||||
| Power Cable | ||||||||||||||||
| Control Cable | ||||||||||||||||
| Lighting Cable | ||||||||||||||||
| Terminal Plan for Control Cable | ||||||||||||||||
| Control Schematic drawing | ||||||||||||||||
| Power and Control Schematic | ||||||||||||||||
| Emergency Light Control Drawing | ||||||||||||||||
| Preparation of all as built drawings | ||||||||||||||||
| PROJ/DVC-WB/023 | Supplying & Fabricating Foundation Steel Bolts including threading as per enclosed drawings complete with 2(two) nos. nuts. The 200mm top portion of bolt is to be galvanised. | Limited | 19-Jul-08 | Single | 28-Jul-08 | 2 | 1) M/s Holymoon & Company 2) M/s Simplex Engineering Co. | NIL | Lowest tender(L1) | BLL/PROJ/DVC-WB/ORD/016, DATED 09.08.08 | M/s Holymoon & Company | 258644 | 30 days from order date | 9-Aug-08 | ||
| 20mm dia HD Bolt, 600mm long, 150 thread at top, 50x8 TH 50 LG at a distance of 30mm from bottom, with three nuts (Ref Drawing: E/S/C-729, Rev-0) | ||||||||||||||||
| 16mm dia HD Bolt, 600mm long, 150 thread at top, 50x8 TH 50 LG (welded) at a distance of 30mm from bottom, with three nuts (Ref Drawing: E/S/C-727, Rev-1) | ||||||||||||||||
| 20mm dia HD Bolt , J type, 610 mm(L), 90mm bend, 100mm thread at top with 2 nuts (Ref Drawing: E/S/C-762, Rev-1) | ||||||||||||||||
| 20mm dia HD Bolt , J type, 610 mm(L), 90mm bend, 100mm thread at top with 2 nuts (Ref Drawing: E/S/C-719, Rev-1) | ||||||||||||||||
| 20mm dia HD Bolt , J type, 510 mm(L), 90mm bend, 100mm thread at top with 2 nuts (Ref Drawing: E/S/C-779 ) | ||||||||||||||||
| 20mm dia HD Bolt , J type, 510 mm(L), 90mm bend, 100mm thread at top with 2 nuts (Ref Drawing: E/S/C-778 ) | ||||||||||||||||
| 25mm dia H.D Bolt J type, 1000mm (L), 75mm bend, 75 mm thread at top with 2 nos nut.(Ref drawing-E/S/C-610) | ||||||||||||||||
| 20mm dia HD Bolt, 825mm long, 100 mm thread at top, 75x10 TH 15 LG (welded) at a distance of 30mm from bottom, with two nuts (Ref Drawing: E/S/C-731) | ||||||||||||||||
| 25mm dia H.D Bolt J type, 1000mm (L), 100mm bend, 100 mm thread at top with 2 nos nut.(Ref drawing-E/S/C-504) | ||||||||||||||||
| 16mm dia H.D Bolt(with two units) J type, 550mm (L), 75mm bend, 50 mm thread at top with 2 nos nut.(Ref drawing-E/S/C-504) | ||||||||||||||||
| 16mm dia HD Bolt, 550mm long, 150mm thread at top, 50x6 THK 50 LG with two nuts (Ref Drawing: E/S/C-726, Rev-1) | ||||||||||||||||
| 25mm dia H.D Bolt J type, 1150mm (L), 100mm bend, 125 mm thread at top with 2 nos nut.(Ref drawing-E/S/C-688 rev-02) | ||||||||||||||||
| PROJ/DVC-BIADA/072 | Construction of Road :- | Limited | 5-May-08 | Single | 05/14/08 | 3 | 3 (Raj Construction, Sri Shivshakti Enterprises, S.R. Enterprises) | nil | Lowest tender(L1) | BLL/PROJ/DVC-BIADA/ORD/80 Dt. 13.08.08 | Raj Construction | 1358700 | 60 days | 13-Aug-08 | ||
| Preparation of subgrade by excavating earth (in all sorts of soil) to an average of 225 mm depth (box cutting), dressing to camber and grades and consolidation with road roller including making good the undulation etc. & disposal of surplus earth upto 50 metres. | ||||||||||||||||
| Consolidation of subgrade with power road roller of 8 to 12 tonnes capacity including making good the undulations etc. with earth or quarry spoils etc. & rerolling the subgrade | ||||||||||||||||
| Supplying and stacking of 90 mm to 45 mm graded stone aggregate at site | ||||||||||||||||
| Laying water bound macadam base course with 90 mm to 45 mm size stone aggregate including stone screening with 13.2 mm size and blinding material including screening, sorting, spreading to template and consolidation with power road roller of 8 to 10 tonne capacity etc. complete (payment for stone aggregate, screenings, kankar, morum and red bajri etc. to be made separately) | ||||||||||||||||
| Supplying and stacking of moorum at site | ||||||||||||||||
| Supplying and stacking of 13.2 mm nominal size (type A) stone screenings / chipping at site | ||||||||||||||||
| Brick edging with bricks laid length wise with half brick depth including excavation refilling and disposal of surplus earth lead upto 50 metres. | ||||||||||||||||
| 2.5 cm premix carpet surfacing with 2.25 cum. And 1.12 cum of stone chippings of 13.2 mm and 11.2 mm size respectively per 100 sqm. And 52 kg and 56 kgs of hot bitumen per cum. of stone chippings of 13.2 mm and 11.2 mm size respectively including a tack coat with hot straight run bitumen with paving Asphalt 80/100 heated and then mixed with solvent at the rate of 70 grames per kg of asphalt, including consolidation with road roller of 6 to 9 tonne capacity etc. complete; (tack coat to be paid for separately). | ||||||||||||||||
| Providing and applying tack coat using bitumen emulsion (Rapid Setting) complying with IS 8887 - 1995, on W.B.M @ 0.4 kg/sqm Spraying the bitumen emulsion with mechanically operated spray unit, cleaning and preparing the existing road surface as per specifications. | ||||||||||||||||
| Providing and laying seal coat of premixed fine aggregate (passing 2.36 mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade 80 / 100 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road roller all complete | ||||||||||||||||
| Providing and laying 50 mm compacted thickness Bitumen Penetration Macadam with hard coarse aggregate of size 50-20 mm graded @ 0.60 cum per 10 sqm key aggregate of size 12.5 mm graded @ 0.15 cum per 10 sqm. with bitumen of suitable penetration grade (with paving asphalt 80/100 @ 50 kg/10 sqm) including required key aggregate as specified, spreading coarse aggregate with the help of self propelled / tipper tail mounted aggregate spreader and applying bitumen by a pressure distributor and then spreading key aggregate with the help of aggregate spreader comlete including consolidation with raod roller of minimum 8 to 10 tonne capacity to achieve specified values of compaction and surfaceaccuracy. | ||||||||||||||||
| Earth Working filling including dressing, watering & ramming in layers not exceeding 15 cm.in embankment etc. formed by excavated earth | ||||||||||||||||
| PROJ/DVC-BIADA/085 | 40 mm dia M.S Rod(Round) | Limited | 10-Jul-08 | Single | 21-Jul-08 | 2 | 1) Continental Steel Syndicate 2) Narindra & Narindra | NIL | Lowest tender(L1) | BLL/PROJ/DVC-BIADA/ORD/079, dated 11.08.08 | Narindra & Narindra | 441530 | 7 days | 11-Aug-08 | ||
| BLL/569 | PUSH BUTTON SWITCH | LIMITED | 5-Jul-08 | SINGLE | 19-Jul-08 | 3 | N/A | N/A | L(1) | HR/44524, DT.5.8.08 | BHAGIRATH ELECTRIC COMPANY | 0.65 | OCT'08 | |||
| BLL/575 | SERVO CONTROLLED VOLTAGE STABILISER | LIMITED | 12-Jul-08 | TWO | 21-Jul-08 | 3 | N/A | N/A | L(1) | HR/44604/CAPEX, DT.27.8.08 | MOTOLINE ELECTRONICS | 0.58 | SEP'08 | |||
| BLL/576 | PORTABLE AIR COMPRESSOR | LIMITED | 12-Jul-08 | TWO | 21-Jul-08 | 1 | N/A | N/A | L(1) | HR/44607/CAPEX, DT.28.8.08 | U D MARKETING PVT. LTD., | 0.70 | SEP'08 | |||
| BLL/579 | TRANSFORMER OIL | LIMITED | 22-Jul-08 | SINGLE | 5-Aug-08 | 2 | N/A | N/A | L(1) | HR/44540, DT.11.8.08 | INDIAN PETRO PRODUCTS MFG PRIVATE LTD | 5.08 | OCT'08 | |||
| BLL/580 | PACKING CRATE | LIMITED | 22-Jul-08 | SINGLE | 26-Jul-08 | 3 | N/A | N/A | L(1) | HR/44508, DT.4.8.08 | ANWAR ALI & COMPANY | 2.51 | DEC'08 | |||
| HR/44509 | HASSAN BROTHERS | 1.75 | DEC'08 | |||||||||||||
| BLL/581 | MACHINING COMP. | LIMITED | 24-Jul-08 | SINGLE | 29-Jul-08 | 3 | N/A | N/A | L(1) | HR/44558, DT.14.8.08 | INDO DESIGNERS | 1.82 | OCT'08 | |||
| HR/44560 | MA BHADRAKALI ENGINEERING WORKS | 0.72 | ||||||||||||||
| HR/44559 | NAVA BHARAT ENTERPRISE | 1.09 | ||||||||||||||
| BLL/582 | MACHINING COMP. | LIMITED | 26-Jul-08 | SINGLE | 2-Aug-08 | N/A | N/A | L(1) | HR/44567, DT.19.8.08 | HARA BROTHERS | 0.07 | OCT'08 | ||||
| HR/44568 | MIDAS ENGINEERING WORKS | 0.05 | ||||||||||||||
| HR/44569 | PRASAD ENGINEERING | 0.18 | ||||||||||||||
| HR/44566 | T.M.ENGINEERING WORKS | 0.16 | ||||||||||||||
| BLL/583 | COPPER FLAT | LIMITED | 2-Aug-08 | SINGLE | 8-Aug-08 | 3 | N/A | N/A | L(1) | HR/44543, DT.12.8.08 | ARYAVARTA DHATU UDYOG | 4.01 | AUG'08 | |||
| BLL/584 | COPPER ROD | LIMITED | 2-Aug-08 | SINGLE | 8-Aug-08 | 3 | N/A | N/A | L(1) | HR/44544, DT.12.8.08 | ARYAVARTA DHATU UDYOG | 3.21 | AUG'08 | |||
| BLL/586 | COPPER ROD | LIMITED | 8-Aug-08 | SINGLE | 14-Aug-08 | 3 | N/A | N/A | L(1) | HR/44572, DT.19.8.08 | ARYAVARTA DHATU UDYOG | 3.44 | AUG'08 | |||
| BLL/587 | M/C. COPONENTS | LIMITED | 14-Aug-08 | SINGLE | 08/20/08 | N/A | N/A | L(1) | HR/44581, DT.23.8.08 | T.M.ENGINEERING WORKS | 0.47 | OCT'08 | ||||
| ENQ/0485 | RENOVATION OF LOCO SHED AT SGW | LIMITED TENDER | 02.07.08 | SINGLE | 17.07.08 | 4 | 1) WALLS & ROOFS, 2) M C CONSTRUCTION, 3) S K GHOSH & COMPANY & 4) BHATTACHARYA CONSTRUCTION | L1 | AD/HR/2182/SER DT. 14.08.08 | M/S M C CONSTRUCTION | 1.67 | 15 DAYS | ||||
| ENQ/0486 | RENOVATION OF LOCO SHED AT SGW | LIMITED TENDER | 02.07.08 | TWO BID | 17.07.08 | 3 | 1) WALLS & ROOFS, 2) M C CONSTRUCTION, 3) BHATTACHARYA CONSTRUCTION | L1 | AD/HR/2184/SER DT. 30.08.08 | M/S M C CONSTRUCTION | 4.07 | 75 DAYS | ||||
| 9773/AS | MFG OF SILVER BEARING COMMUTATOR OF 171 SEG. | LIMITED | 16-05-08 | SINGLE | 24-05-08 | 3 | 1.THE BENGAL COMMUTATOR WORKS. 2.DOLPHIN ELECTRIC (INDIA). 3.SAHNEY COMMUTATORS PVT. LTD. | NIL | L - 1 | MB/12087/ER Dt.01-08-08. | THE BENGAL COMMUTATOR WORKS | 1138800.00 | THIS ORDER IS FOR ONE YEAR RATE CONTRACT FROM AUG'08 TO JUL'08. | AUG'08 | 31ST JULY'09 | |
| 9781/AS | NEW COMMUTATOR WITH ETP GRADE COPPER SEGMENT-155 | LIMITED | 17-05-08 | SINGLE | 24-05-08 | 3 | 1.THE BENGAL COMMUTATOR WORKS. 2.COMMUTATOR MFG. 3.DOLPHIN ELECTRIC (INDIA). | NIL | L - 1 | MB/12125/ER Dt.012-08-08. | COMMUTATOR MFG | 122304.00 | THIS ORDER IS FOR ONE YEAR RATE CONTRACT FROM AUG'08 TO JUL'08. | AUG'08 | 31ST JULY'09 | |
| 9772/AS | MFG OF NEW COMMUTATOR AS PER SAMPLE/DRAWING | LIMITED | 16-05-08 | SINGLE | 24-05-08 | 3 | 1.THE BENGAL COMMUTATOR WORKS. 2.DOLPHIN ELECTRIC (INDIA). 3.SAHNEY COMMUTATORS PVT. LTD. | NIL | L - 1 | MB/12088/ER Dt.01-08-08. | THE BENGAL COMMUTATOR WORKS | 1001083.00 | THIS ORDER IS FOR ONE YEAR RATE CONTRACT FROM AUG'08 TO JUL'08. | ON REQUEST | ||
| 9979/AS | H-71 THINNER - 218 | LIMITED | 09-06-08 | SINGLE | 15-06-08 | 2 | 1. BRITISH ELECTRIC MANUFACTURING CO. 2.HATIM AND COMPANY. | NIL | L-1 | MB/12158/ER Dt.28-08-08. | BRITISH ELECTRIC MANUFACTURING CO. | 99834.00 | WITHIN 15 DAYS. | ON REQUEST | ||
| THINNER T- DR. BECK (234 FOR INSULATING VARNISH ) | ||||||||||||||||
| THINNER 205 FOR ELMO N-160 | ||||||||||||||||
| 9964/AS | EN DGC CU COND. (4 X 2.6 )MM2 | LIMITED | 30-07-08 | SINGLE | 08-08-08 | 2 | 1.PARAMOUNT CONDUCTORS LTD. 2.SAGUN COPPER CONDUCTORS (P) LTD. | NIL | L-1 | MB/12135/ER Dt.13-08-08. | SAGUN COPPER CONDUCTORS(P) LTD. | 124533.00 | WITHIN 15 DAYS. | 19-08-08 | 10/9/2008 | |
| 9924/AS | EN DGC CU COND. (3.8 X 6.85 )MM2. EIGI,H | LIMITED | 23-07-08 | SINGLE | 31-07-08 | 3 | 1. PARAMOUNT CONDUCTORS LTD 2.SWARNAGIRI WIRE INSULATIONS PVT. LTD. 3.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | MB/12121/ER Dt.12-08-08. | SAGUN COPPER CONDUCTORS(P) LTD. | 68737.98 | WITHIN 15 DAYS. | 18-08-08 | 10/9/2008 | |
| 9925/AS | EN DGC CU COND. (1.55 X 7.95 )MM2. EIGI,H | LIMITED | 23-07-08 | SINGLE | 31-07-08 | 3 | 1. PARAMOUNT CONDUCTORS LTD 2.SWARNAGIRI WIRE INSULATIONS PVT. LTD. 3.SAGUN COPPER CONDUCTORS(P) LTD. | NIL | L-1 | MB/12122/ER Dt.12-08-08. | SAGUN COPPER CONDUCTORS(P) LTD. | 86797.79 | WITH IN 15 DAYS. | 18-08-08 | 10/9/2008 | |